Send us the early works scope in Wollongong
Our Sydney estimators call back.
Early Works Contractor Wollongong
Demolition and Early Works Contractor in Wollongong
Early works packages in Wollongong: Occupied or derelict site to a build ready platform, one contract
- One contract instead of five, one program
- Licensed for demolition and Class A friable asbestos removal
- Costed methodology and program you can tender against
- Occupied or derelict site to a build ready platform, one contract
For developers, head contractors, Tier 1 and Tier 2 civil contractors, government and institutional clients and their project managers. One contractor takes the site from occupied or derelict to a build ready platform and hands it over with the documentation pack.
Or call now: 02 8015 6345

How the early works package runs in Wollongong
Early works packages fail when four contractors each own a slice and nobody owns the program. One contract fixes that.
Tender response
Send drawings, scope, hazmat register and geotech. Back comes a costed methodology, program and price.
Site establishment
Hoarding, fencing, access control, amenities, exclusion zones, traffic control, sediment and environmental controls.
Services
Location, proving, isolation and capping before ground work. Disconnections and diversions coordinated with the authorities.
Hazmat first
Asbestos and lead out under our own licences, SafeWork NSW notified, the licensed assessor's clearance on file before structural demolition.
Demolition
Strip out and mechanical demolition to AS 2601, material separated by stream. Old footings, slabs, hardstand, tanks and redundant services out of the ground.
Excavation and shoring
Bulk and detailed excavation to the levels on the drawings under survey control. Shoring and propping installed to the temporary works engineer's design by the same crew. Rock broken or sawn.
Contaminated soil
Excavated, classified and segregated to the consultant's remediation action plan, every load tracked to a licensed facility.
Crushing and handover
Concrete crushed and screened on site for road base where the spec allows. Platform levelled, surveyed, handed over.
What is in the handover pack
- Survey of the finished platform
- Asbestos control plan, SWMS, air monitoring and the licensed assessor's clearance
- Waste tracking dockets for every load
- Service isolation and disconnection records
- Shoring installation records and the engineer's sign off
- Compaction results where concrete was crushed for reuse
Scope we take on
Whole building demolition, see building demolition Wollongong. Friable and bonded asbestos under our own Class A licence. Contaminated soil, see contaminated soil removal Wollongong. Bulk and detailed excavation, rock and dewatering, see civil works and detailed excavation. Shoring to the engineer's design, see excavation shoring installation.
What we do not do
We do not design. The temporary works engineer designs the shoring, hoarding and retention and we install to it. We do not certify; the engineer signs off the installation, the licensed assessor issues the asbestos clearance and the consultant validates the soil. We do not build the vertical structure or the permanent civil works. Piling is not our trade. Concrete cutting sits with Perfect Concrete Care, strip out on its own with Perfect Strip Out and Demolition.

Plant and crews
Our own excavators from under one tonne to over 35 tonne, plus high reach and long reach machines, positracks, hook trucks, tippers and Brokk robots, with shears, pulverisers, rock saws and hammers. Our own operators and supervisors. Waste moves under the company's own New South Wales EPA waste transport licence.
Licences and systems
Conditional Restricted Demolition Licence with SafeWork NSW, Demolition Licence with Workplace Health and Safety Queensland, Friable Asbestos Removal Licence Class A, which covers bonded material too. ISO 9001, 14001 and 45001. Details on the licences and insurance page.
Who we work for
Developers who appoint one early works contractor before the head contractor takes the site. Head contractors buying the package as a subcontract. Tier 1 and Tier 2 civil contractors clearing corridors. Transport agencies, councils, hospitals, schools and defence estates.
Where we work in Wollongong
The jobs where we held the principal contractor role, Cottonwood Crescent, Rose Bay, Cleanaway St Marys, Greenwich Road and Emu Plains, are all in Sydney. Closest to Wollongong is the coke works demolition at Corrimal. Crews, plant and supervisors come down from our Marrickville yard. Sites in Wollongong include Port Kembla, Unanderra, Kembla Grange, Corrimal, Shellharbour, Albion Park Rail and Kiama, and Nowra and the Shoalhaven.
Early works packages we have delivered in New South Wales
Legacy Property Group engaged us as principal contractor at Cottonwood Crescent, Macquarie Park: two multi storey apartment buildings, hardstand and services demolished, disconnections coordinated with the authorities, site handed over development ready. At Rose Bay we hold the principal contractor role for the early works and the staged dig. At Greenwich Road we were principal contractor for top down demolition, retention of two existing basements and the bulk dig with our own excavators. For Cleanaway at St Marys a fire damaged demolition package ran under a principal contractor model on an operating industrial site. At Emu Plains for Akura we were lead contractor for demolition, on site crushing to road base and bioremediation, handed over as a validated platform; the Emu Plains write up records the role as principal contractor, construction delivery only. On each job the head contractor took the site at platform handover.
As a subcontractor the package is the same minus the WHS role: Wyong town centre for Transport for NSW, site establishment, disconnections and asbestos ahead of the demolition; St Joseph's College, Hunters Hill for FDC, asbestos soil out, sandstone sawn and bulk excavation; Sydney Metro Southwest for the John Holland Laing O'Rourke Joint Venture in possession windows; Bonnyrigg Stage 2 for JK Williams, asbestos fill out and dewatering ahead of the civil works. The Corrimal coke works is the Illawarra proof: heritage industrial demolition and land rehabilitation with most of the material recycled. More on the early works hub for New South Wales.
Questions we get from Wollongong developers and builders
Can you act as principal contractor for the early works package?
Yes, where the client wants it. We can act as principal contractor for the early works package: site possession, WHS management plan, inductions and notifications for that stage. The head contractor takes the site at platform handover.
Does the temporary works engineer design the shoring, or do you?
The engineer. We install trench shields, hydraulic shoring and sheet and soldier walls to the engineer's design, and the engineer signs off the installation.
Do you handle the contaminated soil in Wollongong or bring in a second contractor?
Same crews, same package. Soil goes out to the consultant's remediation action plan, tracked to a licensed facility. The consultant validates, not us.
Other places we run early works packages
Also in Sydney, Newcastle, Brisbane, Gold Coast and Sunshine Coast.
Got a site to clear in Wollongong?
Send the drawings and scope through the form, or call.
Call 02 8015 6345