Plant Decommissioning Contractors

Get a price for a plant decommissioning

Two fields. An estimator who has run these jobs calls you back, usually the same day.

    Plant decommissioning and live plant demolition, Australia wide

    Plant decommissioning: Industrial plant out while the rest of the facility keeps producing

    • Redundant lines, vessels, conveyors and whole facilities isolated, made safe and removed
    • Sequenced around your production calendar and shutdown windows, not around our machines
    • Hazmat, process cleaning and contaminated ground under our own licences
    • Steel, stainless, copper and resaleable equipment weighed and credited against the price

    Perfect Contracting takes industrial plant out of service and off site: a single line while the plant next door keeps running, or the whole facility when it does not. Isolation, decontamination, dismantling, demolition, scrap recovery and site validation in one contract, from yards in Sydney and Brisbane with crews that travel to every state.

    Or call now: 02 8021 1784
    Elevated work platform at an exposed steel frame during industrial shed deconstruction
    Reverse sequence dismantling from an EWP, The Bays, Rozelle
    Demolition works at Munmorah Power Station on the NSW Central Coast
    Munmorah Power Station, gantry towers craned down for Downer
    Perfect Contracting excavator working inside an industrial shed deconstruction area
    Excavator clearing the floor once the structure above is down

    The plant next door keeps running. That is the job.

    Demolishing a dead factory is easy. Removing line 2 while lines 1 and 3 keep producing, without dust in the product, vibration in the calibrated equipment or a dropped beam across the only forklift route, is the actual skill in plant decommissioning. It starts with isolation. Every service into the removal zone gets identified, isolated, proven and tagged with your operations team before anything is cut. Then the removal runs in a sequence built around your production calendar, not around what suits the machine.

    When a plant or line is being retired for good, the work broadens: isolation and make safe, hazardous material removal, process cleaning, dismantling, structural demolition, scrap recovery and site validation. We take that whole scope under one contract, and the recovered steel is weighed and credited openly against the price. For the heavy structural side of the work see industrial demolition.

    What we take out

    Process lines, tanks and vessels

    Tanks, reactors, pumps and pipework drained, purged, cleaned and certified before anyone cuts. See silo, tank and vessel cleaning for how the certification works.

    Conveyors, crushers and material handling

    Transfer towers, chutes, crushers and conveyor galleries dismantled in sequence, with the structure that carried them. The CHPP guide walks through a typical one.

    Boilers, furnaces, kilns and refractory

    Refractory, brick lining and castable removed with remote machines while the area is still too warm for people. Boilers and furnaces sectioned and lifted out.

    Structural steel, gantries and buildings around live plant

    Portal frames, pipe racks and gantries removed over and beside operating plant with crawler cranes, high reach excavators and reverse sequence dismantling.

    Switchyards, substations and power assets

    Transformers, switchgear and gantries made safe and removed once the network operator has released them. See the substation and power station guide.

    Whole of site closure

    When the facility is finished, the whole lot: hazmat, plant, structures, slabs, footings and soil remediation, handed back validated. For mines see mine demolition, decommissioning and closure.

    Shutdown windows

    Fixed windows are normal in this work: a two week shutdown where the removal must be finished when production restarts. We plan those with redundancy, spare crew, spare gear and a sequence with float, because the window does not move for anyone. A day of lost production at a cement plant, a refinery or a processing facility costs more than the entire demolition package, so the programme is built backwards from the restart date. For the detail on how we run inside a shutdown, including a worked twelve day example, see shutdown and turnaround demolition.

    The scrap is part of the price

    Industrial plant carries serious recovery value: structural steel, stainless, copper, motors and sometimes resaleable equipment. We weigh it, document it and credit it against the contract, and we flag anything worth more standing than scrapped. At the Manildra flour mill the equipment on top of the bins was lifted off and set aside for the mill before a wall came down. See steel recycling and scrap recovery for how the credit is worked out.

    Hazmat in older plants

    Asbestos gaskets and lagging, lead paint on steel, contaminated residues in vessels. Standard in anything built before the nineties. Our own Class A friable asbestos licence and hazmat crews mean a find changes the day, not the programme, and there is no second contractor to wait for. Process residues that are toxic in their own right, like the arsenic in a BIOX plant or the cyanide circuit in a gold processing plant, are priced and handled as part of the decommissioning, not discovered halfway through.

    Planning a shutdown or a closure? Talk to us months out, not weeks. The best removal sequences are built around maintenance windows you already have, which costs you no extra downtime. Send the process description, the hazmat register, the P and IDs if you have them and any environmental site assessment, and the price will be right the first time.

    What a job like this looks like

    The Burwood decommissioning on Parramatta Road is a fair example of plant coming out over something that cannot stop. The Acciona Ferrovial joint venture needed the Beirut acoustic shed and its internal structures removed from above a live Sydney Metro station box, between October 2024 and March 2025, while tunnelling and shaft work carried on underneath.

    The sequence was set by what was below, not by what was quickest. Programme windows for crane access were shared with the tunnelling logistics, and our supervision was co-located with the client's operations team so every lift was agreed before it happened. The shed came apart in reverse sequence: cladding, then purlins, then structural steel, with dual crane lifts for the roof and wall panels. Inside, columns, footings and in-shed concrete came out with oxy cutting, shear separation and vibration controlled breaking, with the capping beams, anchors and shotcrete walls protected throughout. The job finished three weeks ahead of programme with 98 percent of the material recycled and no harm to anyone. The full write up is on the Burwood decommissioning project page.

    Decommissioning jobs we have done

    Power and infrastructure plant: Munmorah Power Station for Downer, the Rozelle acoustic sheds lifted out with a 650 tonne crawler crane, and the Burwood shed described above.

    Process plant: the Cleanaway liquid waste tank farm at Unanderra, five weeks from pre-start inspection of every tank and line to a validated handover, and the Manildra flour mill in Orange after an explosion.

    Government assets: three core sample libraries at Gunnedah, Gulgong and Yerrinbool decommissioned for the NSW Government, with the samples worth keeping re-strapped and relocated to the client's laboratory and the rest disposed of through local facilities.

    Plant by plant

    We have written up how specific plant types come out safely, licence by licence and hazard by hazard: coal handling and preparation plants, gold processing plants, BIOX plants, cement plants, asphalt plants, concrete batching plants and substations and small power stations. For wind and solar assets reaching end of life see renewable energy decommissioning, and for the demolition input into a mine closure study see closure study input.

    Where we work

    Head office and yard in Marrickville, Sydney, a Queensland yard in Slacks Creek, Brisbane, and crews that travel to every state and territory. Travel, accommodation and float are built into the price up front. Industrial demolition by city: Sydney, Newcastle, Wollongong, Brisbane, Gold Coast and Sunshine Coast.

    Questions we get asked

    Can you decommission a line without stopping production?

    Often, yes. Staging, physical separation and out of hours work for the noisy parts let lines 1 and 3 keep running while line 2 comes out. Where a stoppage cannot be avoided we hold it to a planned window and build the sequence backwards from your restart date.

    Who handles the electrical and process isolation?

    It is planned jointly. Your operators know the plant, we bring the removal sequence, and every isolation is identified, proven and tagged with your operations team before anything is cut. We work under your permit system, not instead of it.

    What happens to the equipment that comes out?

    Weighed and credited as scrap, or flagged for resale where the value justifies it. Structural steel, stainless, copper and motors all carry recovery value, and you see the reconciliation either way.

    Can you work inside a food or pharmaceutical facility?

    Yes. Hygiene protocols, dust containment and product protection are written into the methodology, and we have worked in operating food plants.

    How far ahead should we talk to you?

    Months out, not weeks. The best removal sequences are built around maintenance windows you already have, which costs you no extra downtime. Four to six weeks is comfortable for a normal shutdown, and we have mobilised faster when something failed.

    Do you write the closure study?

    No. We provide the contractor input: plant inventory, demolition method, hazardous materials, steel credit and a real price. The study itself is written by your consultants. See closure study input for how that works.

    Plant coming out?

    Tell us what it is, whether the site stays live, and your window. We will come back with a sequence and a price with the recovery value shown.

    Call 02 8021 1784
    Talk to a real personCall now

    Aboriginal and Torres Strait Islander flagsPerfect Contracting acknowledges the Aboriginal and Torres Strait Islander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.