Talk to us about your mine site
Name and mobile is all we need. We call back, usually same day.
Mine Demolition, Decommissioning and Closure
CHPPs, washplants, draglines, workshops and whole mine sites decommissioned, demolished and closed out. We work to your closure plan, credit the steel, and leave a site your rehabilitation team can take over.
- ✓CHPP, washplant and processing plant demolition
- ✓Dragline, conveyor and heavy plant dismantling
- ✓Massive scrap steel recovery, credited against the price
- ✓Closure planning and demolition cost studies
- ✓FIFO crews, remote site experience, Australia wide



End of mine life is a project, not a cleanup
A mine at end of life carries decades of structures: the plant, the conveyors, the workshops, the camps, the tanks nobody remembers filling. Closing it properly means a demolition program that talks to the closure plan, the rehabilitation schedule and the regulator, and a contractor who has priced the whole picture rather than just the visible steel.
The steel matters too. Mine infrastructure is scrap-heavy, and on many sites the recovered steel funds a serious share of the demolition. We show that credit openly, docket by docket.
What we demolish and decommission
- Coal handling and preparation plants (CHPPs) and washplants
- Processing plants, crushers, screens and bins
- Conveyor systems, transfer towers and stackers
- Draglines, drills and heavy mobile plant dismantling
- Workshops, bathhouses, offices and camp facilities
- Tanks, fuel farms and hydrocarbon infrastructure
Closure studies and early pricing
Long before demolition starts, closure teams need real numbers for provisioning. We prepare demolition and decommissioning cost studies from your asset registers and drawings: methodology, program, disposal volumes and scrap offsets. The figure is defensible in front of auditors because it is built the way we would actually price the job.
How mine demolition runs safely
Isolation and de-energisation first, hydrocarbons and hazmat out second, then engineered structural demolition, typically high-reach machines and shears with people kept off the steel. Asbestos in older plants is handled under our own Class A and B licences, so a find never stalls the program.
Everything runs under your site systems: inductions, permits, isolation regimes and the daily reporting your registered manager expects.
Early stage? Even if demolition is years away, a proper cost study now sharpens the closure provision. Send the asset list and we will scope one.
Where we work
Sydney head office, Brisbane yard, crews Australia wide. Mine and infrastructure work runs on FIFO and staged mobilisations to every state, including remote sites.
Questions we get asked
Do you work under our site safety systems?
Yes, always. Your inductions, your permits, your isolation regime. Our systems slot in underneath, not instead.
How is scrap handled on remote sites?
Processed to transportable size on site, weighed and freighted to the nearest viable market. Freight economics are built into the credit calculation up front, so the offset shown is real.
Can you do partial decommissioning while the mine still operates?
Yes, staged work around live operations is common: one circuit comes out while the rest keeps running, under isolation and interface controls agreed with your operations team.
Do you handle the rehabilitation too?
We take sites through demolition, subsurface removal and final validation, ready for bulk earthworks and revegetation. Full ecological rehabilitation we deliver alongside specialist partners.
Mine reaching end of life?
Send the asset registers or just the site name. You will get a straight answer on approach, program and what the steel gives back.
Call 02 8015 6345Related services
Closure and rehabilitation works: if your site is moving into closure and you need the earthworks, contamination and demolition scope delivered against a rehabilitation plan, see mine closure and rehabilitation works.