Tank Demolition and Site Clearance for Cleanaway, Orange NSW

Perfect Contracting 35 tonne excavator breaking up the concrete tank pad at a former Cleanaway liquid waste depot in Orange NSW, with the storage tank and shed behind.

Project Details

Location

28 Leewood Drive, Orange NSW

Client

Cleanaway Waste Management

Duration

8 working days, September to October 2025

Completed October 2025. Perfect Contracting carried out the tank demolition and site clearance at Cleanaway's former liquid waste depot at 28 Leewood Drive, Orange NSW. Two horizontal storage tanks, two small sheds, a tank bund and the concrete hardstand under them came out over eight working days, and the yard was handed back cleared and sampled before the lease ran out.

It was the third site Perfect Contracting has cleared for Cleanaway in New South Wales, after the Unanderra tank farm and the St Marys warehouse, and it was priced off the same schedule of rates to save both sides a tender.

Services delivered

  • Principal contractor for the site while Cleanaway's own industrial services crew pumped out and cleaned the tanks
  • Power disconnection, service scan and test holes before any digging
  • Demolition of two small sheds and processing of the materials
  • Oxy cutting of the two horizontal steel tanks into manageable sections, then shearing with the 35 tonne excavator
  • Hammering and saw cutting the concrete slab and tank bund, and removal of the hardstand
  • Test pits dug for the client's environmental consultant
  • Steel to a metal recycler, seven loads of concrete to a local crushing yard for reuse
  • Site secured and made safe at the end of every shift, and handed back cleared

The job

Cleanaway had used the depot for liquid waste collection in the Central West. With the lease ending on 30 November 2025, everything on the yard except the main shed had to go: the two storage tanks on their steel saddles, the bund and concrete pad under them, two small sheds and the pipework that tied it all together. Cleanaway also needed an environmental survey done before handover, which meant test pits across the yard once the slabs were up.

Two horizontal steel storage tanks on saddles inside a concrete bund at a former liquid waste depot in Orange NSW, before demolition.
The two tanks and their bund before work started.

The tanks were marked waste oil and combustible liquids. They had been emptied but not cleaned, so nothing could be cut until they were. Cleanaway's industrial services team came in with a vacuum truck on the second and third days to pump out the residue and wash the shells, while Perfect Contracting ran the site as principal contractor, held the permits and kept the rest of the demolition moving around them.

What made it hard

Three things. The tanks had held combustible liquids, so hot work was a permit job from start to finish, with gas testing before every cut and the cleaning crew signed off before the first flame went near a shell. The job was about 250 kilometres from our yard, so the crew lived away for the job and everything had to be on the first float, because a forgotten attachment is a day lost in Orange. And the client's own crews were working on the same yard, with a vacuum truck parked beside the tanks while we were demolishing sheds on the same yard.

Cleanaway industrial services vacuum truck pumping out and cleaning a storage tank at the Orange NSW depot before demolition.
The client's vacuum truck pumping the tanks out before any hot work.
Inside a horizontal steel storage tank in Orange NSW with a vacuum hose drawing out residue before the tank was cut up.
Inside the tank with the vacuum hose in.
Close view of a horizontal steel storage tank beside a small shed at the Orange NSW depot before demolition.
One of the tanks and a small shed, both in the scope.
Perfect Contracting supervisor in hi-vis inspecting a cleaned storage tank behind a barrier tape exclusion zone at the Orange NSW depot.
Inspecting the cleaned tank before the first cut.

How the tanks came down

Power was disconnected on day one and the sheds came down first, so the 35 tonne excavator had room to work. The services were scanned and test holes dug around the tank pad before the bucket went in, because the yard had a history and the drawings did not show everything.

Once the cleaning crew had pumped the tanks and the supervisor had inspected them, the oxy cutter opened the shells and cut each tank into pieces the excavator could handle. The grab then lifted each section onto the bund and the shear cut it down to scrap size. Nothing was dropped and nothing was cut with liquid still in it. The steel went into the scrap truck as it was processed.

Worker in a disposable suit, harness and full face respirator beside a storage tank marked combustible liquids at the Orange NSW depot during tank cleaning.
Tank cleaning crew in full suits and respirators.
Perfect Contracting excavator with a shear attachment cutting down sections of a steel storage tank on the bund at the Orange NSW depot.
Cut sections going through the shear on the bund.
Excavator grab lifting a curved section of cut steel tank shell over the processing area at the Orange NSW depot.
The grab lifting a shell section onto the pile.
Perfect Contracting excavator processing sheared tank steel inside the concrete bund at the former Cleanaway depot in Orange NSW.
Working the steel down to scrap size inside the bund.
Sheared tank steel stockpiled on the bund beside the retained shed with the excavator behind, Orange NSW depot.
Steel stockpiled for the scrap truck, main shed retained.

With the tanks gone, the hammer went on and the concrete slab and bund came up. The slab was saw cut where it met the pavement that stayed. Seven tipper loads of concrete, about 85 tonnes off the weighbridge dockets, went to a crushing yard in Orange for recycling. The last two days were test pits for the environmental consultant, backfill and a final tidy before the excavator went back on the float.

Perfect Contracting excavator loading broken concrete from the tank pad into a Perfect Contracting tipper at the Orange NSW depot.
Loading the slab out, one of seven loads to the crushing yard.
Excavator bucket opening a test pit in the yard for the environmental consultant at the former Cleanaway depot in Orange NSW.
Test pits for the client's environmental survey after the slab came up.

Safety on a liquid waste yard

Every day started with a documented pre-start signed by the client's representative, a plant pre-start on the excavator and a check that the hazardous materials register was on site. Hot work ran under permits with a gas test before every cut. Tank entry for cleaning was done by Cleanaway's crew under their own confined space permit and rescue plan, in full suits and respirators, with Perfect Contracting holding the exclusion zone. Dust suppression was on the shed demolition and the slab breakout. No incidents and no variations were recorded across the job.

The cleared area where the tank pad and bund stood, with the retained shed behind, at the Orange NSW depot after demolition.
The pad gone and the yard cleared.

Perfect Contracting's role

Perfect Contracting was engaged directly by Cleanaway's Engineering, Projects and Supply Chain team as principal contractor for the demolition and clearance. A Perfect Contracting supervisor ran the site, with an excavator operator, an oxy cutter and a labourer, our own 35 tonne excavator with buckets, grab, shear and hammer, a tipper and a float driver out of Sydney. The crew lived in Orange for the duration.

Because the rates were already agreed from the earlier Cleanaway jobs, the client went from a scope email to a purchase order in a fortnight, and we were on site three weeks after that.

Lessons learned on this job

What worked

  • Pricing off the existing Cleanaway rates. No tender, no negotiation, a PO inside a fortnight and the client could plan around a fixed finish date.
  • Sheds first, tanks second. Clearing the small structures on day one gave the 35 tonne machine room to work and kept the crew busy while the tanks were being cleaned.
  • Cutting the tanks to size before shearing. Oxy cutting the shells into sections meant the shear never had to fight a whole tank, and the scrap truck could load as the pieces came off.

What was difficult

  • Living away. A short regional job still needs accommodation, meals and a plan for the crew's own gear, and that has to be sorted before the float leaves Sydney.
  • Sharing the yard with the client's cleaning crew. Two contractors and a vacuum truck on one small site needs an exclusion zone that moves through the day, not a line on a plan.
  • Test holes on an old depot. Services around the tank pad were not where the drawings said, so every dig started with a scan and a hand hole.

Industrial demolition in the Central West

Depots, workshops and tank installations across Orange, Bathurst and Dubbo are being handed back at the end of leases or cleared for new uses. Perfect Contracting runs demolition in Orange, tank and vessel demolition, plant decommissioning and site remediation from its Sydney base with the same crews, plant and permit systems used on this job.

Perfect Contracting 35 tonne excavator loaded on a float truck for demobilisation from the Orange NSW depot.
Back on the float at the end of the job.

If you have something similar

A depot to hand back, tanks to remove, or a yard that needs clearing and sampling before a lease ends. Call the Perfect Contracting estimating team on (02) 8021 1784, see more Perfect Contracting projects or send us the scope.

GET A FREE QUOTE TODAY!

PERFECT CONTRACTING is capable of carrying out project like

Tank Demolition and Site Clearance for Cleanaway, Orange NSW

with a quick turn around, give us a call today on (02) 8021 1784. Whether you're undertaking a residential or commercial construction project, we have everything you need to ensure the job is completed on time and to budget.

FREE CALLBACK

TALK TO US

WE CALL BACK WITHIN AN HOUR

Leave your details and a real person will call you - no bots, no queues.

We call back within 1-2 hours. Mon-Fri, during business hours.

Talk to a real personCall now

Aboriginal and Torres Strait Islander flagsPerfect Contracting acknowledges the Aboriginal and Torres Strait Islander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.