Demolition of Three Warehouses in Mascot

Demolition of three warehouses in Mascot - Perfect Contracting

Project Details

Location

1-5 Chalmers Cres, Mascot, NSW

Client

Urban Fitouts & Constructions

Duration

4 weeks

Perfect Contracting were engaged by Urban Fitouts & Constructions to complete the demolition of 3x warehouses that used to house catering business. This wasn’t a simple warehouse demolition as it was 3 interconnecting warehouses, each structurally different, containing over 300 tonnes of cool room panels, 600m2 of Asbestos ‘Super Six’ roofing, 80m2 of asbestos containing vermiculite and 400m2 second story office. The total work area of the warehouse was approximately 2500m2.

The works had to be done methodically as there were adjoining properties on either side of the property and multi-level car park behind the property. Works commenced with HAZMAT removal involving a team of 4-5 members and it went for one week. The HAZMAT team stacked and double plastic wrapped the super six sheets and utilised a telehandler to bring the materials down in a controlled safe manner. 

The warehouse’s demolition commenced with creating access at 5 Chalmers and making our way towards 1 Chalmers. We started with our 15T excavator and as space was created, we introduced the 30T excavator to do the bulk of the works and the 5T to help with the loading. A 150T crane also had to be used to bring down 30m long structural beams at 1 Chalmers. 

Overall, it took approximately 3-4 weeks to complete the works.

And it was another successful job for Perfect Contracting.

Demolition of three warehouses in Mascot
Demolition of three warehouses in Mascot
Demolition of three warehouses in Mascot
Warehouse Demolition - Perfect Contracting

GET A FREE QUOTE TODAY!

PERFECT CONTRACTING is capable of carrying out project like

Demolition of Three Warehouses in Mascot

with a quick turn around, give us a call today on (02) 8021 1784. Whether you’re undertaking a residential or commercial construction project, we have everything you need to ensure the job is completed on time and to budget.

Request a Callback!

Let us assist you to find the demolition services you need. Please contact us using the information below or fill out the callback form.

(02) 8021 1784
enquiries@perfectcontracting.com.au

OR

Let us call you back!

We’ll call you back as soon as possible, usually within 10 min.

    aboriginal flagsPerfect Contracting acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.