Warehouse Demolition – Auburn Stabling Yard
The Auburn Stabling Yard in Clyde is an impressive operation. We’re not sure of their motto but with kilometres of non-gazetted roads, scores of workshops and hundreds of workers it has to be something close to ours. Relocated from Eveleigh in
Demo and Excavation – Wiley Park Station
5000 metric tons is a lot of spoil to load out, let alone excavate. That’s 333 tippers, 157 quad dogs or 250 buckets from BMA’s Bucyrus 8750 dragline operating out of Peak Downs. The real mind-blowing part is that by
Ward Excavation – Campbelltown Hospital Pathology
6600. The diameter of the planet Mars in miles. A Nokia mobile phone model from 2003. The amount of US dollars that $8500 AUD gets you. It’s also the volume of material that Perfect Contracting has removed at Campbelltown Hospital as
BP Petrol Station Demolition – Parramatta Light Rail Project
Perfect Contracting was contracted by CPB to undertake the demolition and removal of station building, LPG tanks and contaminated soil. Site was located at 435 Church Street, Parramatta.All works were confined including all equipment, temp structures, storage, workshops, sheds, toilets
Demolition Heritage Restoration in Bondi
Perfect Contracting was contracted by client City Link Piling to undertake civil/residential demolition heritage restoration works at 27 Paul Street, Bondi. We had to take very particular care during the demolition process due to the heritage status of the residence.
Olympic Park Demolition and Civil Works
Perfect Contracting was contracted by FDC to undertake the demolition and detailed excavation of 2 buildings and swimming pool, including civil works following. Before commencing any demolition works all works including equipment, temporary structures, storage, workshops, sheds, toilet accommodation, etc were
Demolition – Randwick, Sydney
Perfect Contracting were contracted by TAYLOR and to carry out Demolition works at a basement in Randwick. The work involved precise demolition of the concrete floor. The scope of work was to excavate down 1.6m from floor level for a
Demolition – Birrong Girls High School
Full single storey building demolitionExcavationAsbestos removalAfter contract tradesman providedPerfect Contracting were engaged to complete the full demolition and removal of a single storey building. The works involved required concrete cutting of certain sections of the building, followed by the operation