Energy infrastructure demolition requires meticulous planning and flawless execution to ensure the safest and most efficient methodologies for removing these assets.
With an unmarked record of delivering complex demolition and removal of energy infrastructure.
Perfect’s synergistic approach to energy projects ensures we develop the most efficient and safest methodologies of removing these complex assets.
Perfect has delivered multiple energy projects throughout Sydney and greater NSW.

Services
Detailed Demolition
Perfect Contracting provides comprehensive detailed demolition services all over Sydney and greater NSW.
Structural Demolition
With modern technology and engineering methodologies, Perfect can carry out complex structural demolition.
Concrete Penetrations
Perfect has extensive experience when it comes to carrying out concrete penetrations in the energy sector.
Hazmat Removal
Perfect Contracting can carry out Friable Asbestos removal projects all across Sydney and greater NSW.
Structural Propping
Perfect Contracting provides integrated structural propping services, including engineering and installation.
Wet Hire
Perfect Contracting offers our entire fleet of specialised machinery for wet hire in Sydney.
Featured projects
Pylon Demolition
DEMOLITION
Client: DOWNER
Perfect Contracting carried out induced controlled demolition of several large power pylons in Badgerys Creek for our client Downer Group.
Once all protections were in place our crew could establish all our equipment on site to carry out the demolition works. For this project, we used our 24T Sumitomo Excavator. Our client’s rigger then installed the sling onto the pylon that would be held by our Excavator.Next, our client’s hot works personnel prepared the area for hot works, by dampening all surrounding plant and vegetation. Once the area was ready our experienced oxy cutters carried out the sequenced oxy cuts on the legs.
When all primary sequences were cut our demolition supervisor instructed all unnecessary personnel to vacate the exclusion zone. Once the area was clear and all personnel accounted for our demolition supervisor radioed our Excavator Operator to increase the tension and bring the tower down. Once the tower was fully down our Excavator Operator switched to the shears attachment and began cutting the pylon into small pieces and loading it into our skip bins for recycling.
- Controlled demolition of multiple 35m high power pylons
- Installation of slings rated 2T SWL
- Hot works personnel to prepare the water trailer and cutting equipment
- Oxy cut legs of the tower in the sequence outlined
- Cut the pylon into small sections with shear’s attachment on Excavator
- Load steel into allocated skip bins for removal from site to the nearest recycling facility

Munmorah Power Station
DEMOLITION
Client: DOWNER

Perfect Contracting was engaged by our client Downer Group to supervise detailed demolition works at Munmorah Power Station. These works required an Unrestricted Demolition Licence to carry out the works. Perfect Contracting supplied our client with one of our most experienced demolition supervisors to assist them in carrying out the works.
These works involved the use of high reach boom lifts, a thirty-tonne mobile crane and experienced riggers and dogmen to dismantle and safely crane down multiple gantry towers within the power station.
- Controlled demolition of multiple 35m high power pylons
- Installation of slings rated 2T SWL
- Hot works personnel to prepare the water trailer and cutting equipment
- Oxy cut legs of the tower in the sequence outlined
- Load steel into allocated skip bins for removal from site to the nearest recycling facility
Experience


People
The key to Perfect’s continual success is down to one key factor, Our People.
Our crews are the ones out there doing the hard graft every single day, ensuring your project gets delivered on time, every time. Because that’s what we do. We get it done.
From management and operations to engineering and estimating to supervisors and ground workers – Perfect hires only the best. Continual improvement processes ensure regular training, new tickets and upskilling.
Fleet
Perfect operates its own fleet of heavy-duty state-of-the-art machinery ranging from nimble 0.8t excavators to large positracks to 35t excavators. Additionally we operate an armada of hook trucks and skips, tippers, EWP’s, forklifts, Brokks, lifts, scaffolding and almost every tool known to man.
With our continued investment in emerging technologies, safety and innovation, Perfect’s service scope ranges from the simple & straightforward to the thoroughly technical to the downright demanding.