
With a strong history of project delivery to government clientele, Perfect Contracting is confident it can bring the necessary prowess to the complex nature of our water and marine assets.
A decade of tier one construction has given us the clout to work in this often intricate space. With technical knowledge encompassing almost all facets of construction & demolition – local, state and federal water assets lie at the heart of Perfect Contracting’s skill set and capability. From more fine elements like data & electrical through plumbing & valving to coarse aspects such as steel & concrete, Perfect Contracting has the necessary proficiency to excel in this sector.
Services
Detailed Demolition
Perfect Contracting provides comprehensive detailed demolition services all over Sydney and greater NSW.
Structural Demolition
With modern technology and engineering methodologies, Perfect can carry out complex structural demolition.
Concrete Penetrations
Perfect has extensive experience when it comes to carrying out concrete penetrations in the water sector.
Hazmat Removal
Perfect Contracting can carry out Friable Asbestos removal projects all across Sydney and greater NSW.
Structural Propping
Perfect Contracting provides integrated structural propping services, including engineering and installation.
Wet Hire
Perfect Contracting offers our entire fleet of specialised machinery for wet hire in Sydney.
Featured projects
Water Treatment Plant
HAZMAT / DEMOLITION
Client: MUSWELLBROOK SHIRE COUNCIL
When the Muswellbrook Regional Council needed specialist demolition and remediation works at their Water Treatment Plant, they turned to the one contractor they knew would answer the call.
With a laundry list of challenging works on scope, Perfect Contracting was enlisted to mobilise their fleet of men and machines to the beautiful regional centre for a nine week deployment. And because the plant is the sole supply of drinking water to the township, there was no room for error.
Due to the age of the facility – and in part to it’s regional location – a non-operational building at the plant had unknowingly been a waste dumping ground for the local fauna. This posed a health risk to workers, so containment of the area was priority numero uno. The area was cordoned off in an airtight biohazard bubble. Removal and cleaning beginning in earnest. Naturally, all materials were disposed of as per EPA regulations. A task not for the faint-hearted, Supervisor Tim went above and beyond to deliver this phase of the scope, ensuring the safety of all MRC workers for years to come.
- Asbestos removal
- Biohazard removal
- Heritage facade retention and remediation
- Structural alteration
- Re-roofing and waterproofing
- Demolition and make safe of the chemical mixing room

Garden Island
HAZMAT
Client: ST HILLERS
The navy calls this primary east coast station Fleet Base East. Also known as HMAS Kuttabal, it comprises roughly half of our naval firepower in the form of six major warships, two heavy landing ships, half a dozen mine hunters and scores of smaller vessels.
Unfortunately, it also contained some unused facilities laden with asbestos and lead – leftovers from previous remedial works. So when defence construction and remedial contractor St. Hilliers needed it gone they enlisted us. HAZMAT is to demo what Spec Ops guys are to regular military: it’s a tough job that requires a specialised mindset to do what nobody wants to do and go where nobody wants to go.

For some context, the warehouse and shower block were adjoined, with access to the block via the warehouse. And because the shower block was on the second floor, everything had to be carried upstairs either by hand or using a commandeered navy gantry crane. The morning of day one saw the decon unit craned onto the second floor to a disused change room. It was set up complete with hot shower and triple water filtration to catch even the finest friable particles. The afternoon saw the construction of the shower block bubble, rendering it airtight.
Once the shower block was dusted, the team remobilised for the lead dust and paint removal. This was located in the disused warehouse adjacent to the now ex-shower block, so the decon unit was craned down to ground level. The history of works in the warehouse was classified top secret, but what we were privy to was that lead dust was everywhere. It had to be vacuumed up and wiped down, with the cleaning materials also needing to disposed of. 300m2 was Hoovered and wet-wiped in just two nights, often at the end of a 17m knuckle boom or the scissor.
- 35t of friable asbestos slab removal
- 300m2 of lead dust from inside a disused warehouse
- 100 lineal metres of lead paint removal
- 300 bay lights were laden with the toxic dust removed
Experience


People
The key to Perfect’s continual success is down to one key factor, Our People.
Our crews are the ones out there doing the hard graft every single day, ensuring your project gets delivered on time, every time. Because that’s what we do. We get it done.
From management and operations to engineering and estimating to supervisors and ground workers – Perfect Contracting hires only the best. Continual improvement processes ensure regular training, new tickets and upskilling.
Fleet
Perfect operates its own fleet of heavy-duty state-of-the-art machinery ranging from nimble 0.8t excavators to large positracks to 35t excavators.
Additionally we operate an armada of hook trucks and skips, tippers, EWP’s, forklifts, Brokks, lifts, scaffolding and almost every tool known to man.
With our continued investment in emerging technologies, safety and innovation, Perfect’s service scope ranges from the simple & straightforward to the thoroughly technical to the downright demanding.
