Removal of the Pedestrian Stairs at Canterbury Station

Infrastructure Sector - Perfect Contracting

Project Details

Location

Canterbury Station, New South Wales

Client

Duration

3 days

The Perfect Contracting team was recently tasked with removing the pedestrian stairs at Canterbury Station for our client Haslin.

The project was complex and required the use of a 400-tonne mobile crane. The stairs, which were no longer needed due to renovations at the station, had to be removed in a manner that would minimize disruption to the daily operations of the station and ensure the safety of all involved.

The first step of the project was to secure all necessary permits and approvals from local authorities. Our team worked closely with the client and relevant stakeholders to ensure that all requirements were met and that the project could proceed smoothly.

Once all preparations were complete, the crane was carefully positioned on site, and the removal process began. The stairs were disconnected from the existing structure and then lifted clear of the building using the crane. The stairs were then transported off-site for disposal.

Throughout the project, the Perfect Contracting team closely monitored the safety of all personnel on-site, as well as the safety of passengers at the station. The team also maintained clear communication with the client to keep them informed of progress and to ensure that the project was completed to their satisfaction.

The removal of the pedestrian stairs was successfully completed on time and within budget. The project was carried out with the utmost care and professionalism, and the end result was a clean and unobstructed space that could be used for other purposes.

Our client, Haslin, was extremely pleased with the results and praised the Perfect Contracting team for their expertise and commitment to safety. The team’s attention to detail and ability to effectively manage a complex project of this nature was key factor in the project’s success.

The Perfect Contracting team is proud of the work that was done at Canterbury Station and is committed to delivering the same level of excellence on all future projects. Whether it is a small repair or a large-scale demolition, our team has the skills and experience to complete the job safely and efficiently, always with the client’s satisfaction as our top priority.

GET A FREE QUOTE TODAY!

PERFECT CONTRACTING is capable of carrying out project like

Removal of the Pedestrian Stairs at Canterbury Station

with a quick turn around, give us a call today on (02) 8021 1784. Whether you’re undertaking a residential or commercial construction project, we have everything you need to ensure the job is completed on time and to budget.

Request a Callback!

Let us assist you to find the demolition services you need. Please contact us using the information below or fill out the callback form.

(02) 8021 1784
enquiries@perfectcontracting.com.au

OR

Let us call you back!

We’ll call you back as soon as possible, usually within 10 min.

    aboriginal flagsPerfect Contracting acknowledges the Aboriginal and Torres Strait Isander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.