Structural Demolition – Marrickville Metro

Structural Demolition – Marrickville Metro

Structural Demolition of Marrickville Metro, Marrickville

Perfect Contracting are currently performing structural demolition works for our client Rork Projects at the Marrickville Metro Shopping Centre, Sydney. The works involved the structural demolition of escalators. Our team members first established temporary site fencing to ensure the safety of the public during the duration of the works. They then established a safe loading dock to allow our tipper trucks access to load out the waste and rubble. Once our access and site fencing was up our team members began unloading all the equipment needed for the works. Our team members constructed our snappy scaffold and began the soft strip-out of the ceiling tiles ensuring the no services were touched. Our client requested that all camera and sprinkler systems were left intact, as they would be used in the new installation. The ceiling stripping and small detail works is stage one of the structural demolitions we are carrying out on this site. The second stage will include the removal of the roof to crane out the escalators and prepare the site for the installation of the new escalators. This will involve the removal of steel structural beams, which will need to be secured with a crane before we cut them with the oxy. All the waste and rubble was loaded into our Isuzu Tipper trucks for removal from site. Result: The client was very happy with the outcome of the works involved and how efficient and professional our team members were.

If you need very technical demolition works performed for your house renovation call the experts at Perfect Contracting to get it done!

Tags: , , ,
Continue reading
Structural Demolition – Caringbah Sports Club

Structural Demolition – Caringbah Sports Club

Structural Demolition of Caringbah Business & Sports Club

Perfect Contracting are currently working on a structural demolition for our client New England Constructions at the Caringbah Business and Sports Club. These works involve a detailed structural demolition of the sports club. Our team members firstly secured the site with temporary fencing to ensure the safety of the public during the duration of the works. Then they setup the loading dock where our Isuzu HR trucks could load out the skip bins this allows for a quick extraction of the waste and rubble created. Then our team members constructed the site office and established all site safety notices and our first aid kit station. Once all our team members were inducted then our site super visor began the toolbox talk about the dangers and potential hazards of this site. Our team members began oxy cutting the steel stairwell to remove it from the structure. Then a safety fence was erected using dyna bolts to bolt it to the ground. This would ensure the safety of works while on site. Next our Concrete Care division Perfect Concrete Care began penetrations on the 1st floor cutting out 2.5m x 800mm sections of the sub-floor as requested by the client. This was done using our Husqvarna Ring Saw which is capable of cutting to depths of 260mm. This allows us to cut right through the concrete slab and leave a nice clean finish. Once all floor tiles were stripped from the 1st floor our team members began erecting two scaffolds to start removing the floorboards from the 1st floor. All these works carried out are part of the first stage of this structural demolition. Result: The client is very happy with the outcome of the works on stage one so far.

If you need structural demolition works performed call the experts at Perfect Contracting, we get it done!

Continue reading
Detailed Demolition and Stripout – Parramatta

Detailed Demolition and Stripout – Parramatta

Detailed Demolition and Stripout of Commercial building in Parramatta

Perfect Contracting recently finished detailed demolition and strip-out works at the Park Trust building in Parramatta for our client Sense Projects. These works included the demolition and strip-out of the lobby floor tiles and bathroom strip-outs, which was one stage of the entire project we carried out for our clients. Our team members started off by securing the site with temporary site barriers to ensure the safety of the public throughout the project. Next they established the access for our trucks and skip bins so that we could quickly and safely remove the waste and rubble from site. Once we had the security and access established our team members began to offload all our machinery and equipment. We used our 1.7tonne Yanmar Excavator and skilled operator to hammer the floor tiles in the lobby, as this was the most efficient methodology. While our skilled operator was performing the floor tile demolition in the lobby our other team members began to perform the bathroom stripouts of the building which was included in the scope of works from the client. Using our Hilti TE70 ATC Jackhammers our team members began stripping the wall and floor tiles from the bathrooms, making sure to carefully disconnecting services and removing all fixtures and fittings. The works were carried out after hours and during the weekend, as the client needed the area to remain functional to the public during normal business hours. All waste and rubble was removed from site using our Tub Bins and Skips. Our trucks were able to drop our skip bins right at the front door of the building this allowed for a fast and efficient removal of all waste and rubble from site. The Result: Our client was very happy with the result of the works carried out and the professionalism of all our team members.
Continue reading
Detailed demolition, Concord, Sydney

Detailed demolition, Concord, Sydney

Detailed demolition and strip-out of a commercial building in Concord, Sydney.

Perfect Contracting are currently working on a detailed demolition and strip-out of a commercial building that has burnt down in concord for All Saints Constructions. The scope of works includes the detailed demolition / strip-out and make safe of the building. Due to the fire the supporting walls were damaged so the first task for our team members is to prop the supporting walls with structural props to ensure the integrity of the building stays intact during the demolition. Once the structural props were in place our team members began stripping out the interior of the building. Our site supervisor ensured all our team members were wearing full PPE at all times to ensure their safety. Next our team members with Working at Heights tickets began the structural demolition of the roof. Once we had safely removed the roof our team members began removing all rubble and waste from the site, which was loaded into our Tub Bin system for easy extraction from the site in our Tipper Trucks. Result: The project was completed on time and within budget and the client was very happy with the works carried out.
Tags: , , , , , ,
Continue reading
Structural Demolition – 122 Long St, Smithfield

Structural Demolition – 122 Long St, Smithfield

Structural Demolition and strip-out in Smithfield, Sydney

Perfect Contracting just finished major structural demolition at Smithfield for Johns Lyng Group PTY Ltd. This involved the demolition, strip-out and structural make safe of a factory unit in Smithfield. Firstly our team members cordoned off the site to ensure the safety of the public throughout the project. Next the client’s engineers assessed the structure and concluded that the outer supporting walls would need to be reinforced with steel props. This would ensure the integrity of the structure was safe to complete the strip-out works. When the props were in place the client’s engineer assessed the site and signed off that the structure was now structurally sound. Once our team members had the all clear the internal strip-out works began. We used our 1.7ton Yanmar Excavator with a skilled operator to strip-out all the factory-shelving units. All the waste and rubbish was loaded into our Isszu Tipper Trucks so we could quickly remove the waste from site. When the internal strip-out was complete we then began works on removing the galvanised roofing sheets. We used an elevated working platform and all our team members had Working at Heights competency and full PPE to ensure their safety. Once all roofing sheets were removed from site, we then began to remove the structural steel girders as the client for this particular project requested it. A mobile crane was used to take the supporting weight off the girders. Once the crane was securely attached our team members then used an elevated working platform to oxy cut the bolts either side of the girder so it could be removed and safely lowered onto the truck for load-out. Result: The project was completed on time, within budget and the client was very happy with the outcome of the works involved.
Tags: , , , , ,
Continue reading
Lift Removal, 165 Philips St, Sydney

Lift Removal, 165 Philips St, Sydney

Perfect Contracting are in the process of performing a Lift Removal and demolition at 165 Philips St. Our experienced riggers are working at the moment stripping the lift shaft of all service pipes and tubing and removing lift doors on each floor as they go down each level.
Tags: , , ,
Continue reading
Brokk Demolition Robot – 165 Philips St

Brokk Demolition Robot – 165 Philips St

Perfect Contracting are currently using a Brokk Demolition Robot to demolish the stairwell at 165 Philips St. We needed the demolition power of a 15 ton excavator but due to the project being with load and size restrictions, it is impossible to get a excavator of that size into the building. This is where the Brokk 90 comes in; the Brokk 90 is one of the most versatile machines available for demolition in restricted areas. When the job has to be done in a confined space, size really does matter. The goal is to bring as much power and flexibility as possible to the site, and the Brokk 90 achieves it.
Tags: , , , , , , ,
Continue reading
Office Strip-out, Avaya House

Office Strip-out, Avaya House

Office Strip-out in Macquarie Park

Perfect Contracting were contracted by INAPHASE to complete an office strip-out and rubbish removal works at Avaya House in Macquarie Park. The works included the removal of workstations, carpet removal and demolition of partition walls.
Tags: , , , , ,
Continue reading
2 Level Office Strip-out, North Ryde Sydney

2 Level Office Strip-out, North Ryde Sydney

Perfect Contracting recently finished the strip-out of two office levels for Intrec Management PTY Ltd in North Ryde. All waste was separated and removed from site for recycling. Perfect Contracting aim to recycle 100% of waste removed from sites.
Tags: , , , , ,
Continue reading
Strip Out, Surry Hills, 10-14 Waterloo St

Strip Out, Surry Hills, 10-14 Waterloo St

Perfect Contracting were hired by Mainbrace Constructions to perform demolition and strip-out works of three floors at 10-14 Waterloo St, Surry Hills. Level A1 is fully stripped-out and we have completed all works on Level A1 already. This project included the removal of over 670m2 of carpet tiles including underlying glue. Strip-out of the Male / Female toilets including tiles, wall tiles and splash-back including render which comes out with tiles, toilet partitions, doors and all toilet fixtures and fittings. Perfect were also contracted to remove 733m2 of existing ceiling tiles and grids.
Tags: , , , , , , , ,
Continue reading