Contaminated site remediation – Horsley Park
https://youtu.be/DJInXAojV-I?si=jZmIP9Kx8G933Ad9This case study examines the remediation efforts undertaken by Perfect Contracting to tackle significant PCB contamination at the old Austral Plant 3 located in Horsley Park. Given the hazardous nature of PCBs and their adverse effects on both the environment
Perfect Contracting’s Successful Demobilisations Strategy for Acciona Bouygues Samsung JV
Project Overview:Acciona Bouygues Samsung JV required professional assistance for the demobilisation strategy of three acoustic sheds constructed as part of the WestConnex project. The sheds were situated over the decline structure leading into the tunnel at three different locations: Haberfield,
Friable Asbestos Decontamination – Horsley Park
This case study explores the extensive and complex removal of friable asbestos conducted by Perfect Contracting during the redevelopment of an old manufacturing facility.Given the high risks associated with friable asbestos, including severe health risks upon inhalation, this project demanded
Corrimal NSW – Corrimal Coke Works demolition and land rehabilitation project
https://youtu.be/BNq6zYCNmJg?si=CU9zOHWTIU8vlIoAPerfect Contracting undertook a major construction and demolition project focused on the redevelopment of the historical Corrimal Coke Works site. This case study analyses the application of sustainable practices employed by Perfect Contracting to address environmental, heritage preservation, and community engagement
Demolition Project at Chatswood North Dive Site
Getting road traffic across Sydney via tunnel is the state and federal government’s best long term solution to ease the burden on surface roads. It’s also one of the most labour intensive. A myriad of other factors aside, the removal of
Complex Structural Demolition – Elizabeth Bay
https://youtu.be/9-mn6bAv7ng?si=1qzW4P5G10zhjxNLPerfect Contracting was contracted for a large-scale, complex structural demolition of a 4-storey building in Elizabeth Bay by Novati Constructions. The building consisted of brick walls, 200 mm thick concrete floor and roof slabs and up to 450mm thick ground