Demolition – Chatswood Train Station

Demolition – Chatswood Train Station

Perfect Contracting has been engaged by our client Ichor Constructions to carry out detailed demolition works at Chatswood Train Station. The scope of works carried out by our team members so far includes: • Remove existing GAC booth • Partially demolish control room on the platform. Assumed single brick external skin, plasterboard ceiling, carpet floor, single gyprock wall, metal roof. • Demolish existing ceiling in platform bathroom 11 m2 • Create penetration in platform bathroom for new vent. 300 x 300mm • Remove existing Windbreaks INCL • Relocating 10 seats • Trench/detailing works at ticket gates • 3 x trench/detailing works Our team members met with our client’s representative on site to obtain all requirements of the works to be carried out. As these works were mainly carried out after hours. Firstly our team began by demolishing the existing GAC Booth from the platform. Using our large Hilti TE1500 Jackhammers and swiftly removing all waste materials from the site. Next, our team members went about removing the Windbreaks on the platform, to remove these windbreaks our team members jackhammered the surrounding tiles and concrete surrounding the steel beam. Once they exposed the bolts that were holding the beams in place they then cut the bolts with our Hilti 5” Cordless Ginder. The scope of these works also included the relocation of ten sets of seats. Our team members removed the bolts securing the seats to the platform with our Makita Impact Hammers; all ten benches were then relocated to another part of the platform pre-determined by our client.

Perfect Contracting have years of experience carrying out detailed demolition on rail projects all across Sydney and greater NSW. Call our office today to discuss your project!

Tags: , ,
Continue reading
Demolition – Parramatta Train Station

Demolition – Parramatta Train Station

Demolition – Parramatta Train Station

Perfect Contracting recently completed detailed demolition works for our client Infrastruction Group on a possession weekend at Parramatta train station. These works involved the removal of floor tiles from the concourse. The scope of work from our client was to remove over 179m2 of tiles including up to 30mm of bedding on Platform 3. This also included removing existing grey and yellow tactiles from Platform 2. All these works were carried out during a possession weekend. For these works we had over fifteen team members working on the concourse. The majority of the tile was removed by out 1.7t mini-excavator and experienced operator. The rest of our team members carried out the detailing using our Hilti TE1000 and TE1500 Jackhammers. All the works were supervised by our experienced site super visor to ensure the works were carried out in the safest possible manner. All our team members had RIW (Rail Industry Worker) tickets and all the necessary inductions needed to carry out the works on the concourse. We also supplied our client with our skip bins and carried out the load out during the weekend. Result: Our client was delighted with the quality of the works carried out and professionalism of our team members.

Perfect Contracting have the experience and capabilities to carry out detailed Infrastructure Demolition projects. Call our office today!

Tags: , , , , ,
Continue reading
Demolition – North Sydney Train Station

Demolition – North Sydney Train Station

Demolition – North Sydney Train Station

Perfect Contracting were engaged by our client Obson Projects to complete demolition works at North Sydney Train Station. These works involved the tile removal and demolition of part of the North Sydney Train Station. The full scope of works for this project was to strip the tiles from a section of the concourse. On some parts of this project we were able to use our small 1tonne Yanmar Excavator with hammer attachment, this made the tile stripping a lot faster and meant we could focus on loading out the rubble as quick as possible. For other part of this project the access was limited so we could not get our excavator into the area so all tiles were removed with our Hilti TE800 Jackhammers and wide chisels. One stage of the works carried out was to strip the tiles from the stairs and landing within the concourse. As the area was still a live public area most of these works were completed after hours. Site barriers were setup to protect the public while carrying out the demolition works. All waste and rubble was loaded out in our Isuzu Tipper trucks and 100% of waste and material removed from the site was recycled. Result: Our client Obson Projects were very pleased with the quality of the works carried out.

Perfect Contracting can carry out complex and detailed structural demolitions!

Continue reading
Structural Demolition – Marrickville Train Station

Structural Demolition – Marrickville Train Station

Structural demolition of bus platform with Husqvarna DXR 310 demolition robot

Perfect Contracting recently finished structural demolition works at Marrickville Train Station for our client ARENCO, these works included the detailed structural demolition of the bus shelter beside the station using the Husqvarna DXR 310 demolition robot. [embed]https://www.youtube.com/watch?v=AC9AV520kTg&feature=youtu.be[/embed] Firstly our team members secured the site as all works were carried out in a live public site during the weekend so public safety was a high priority. Our team members began by establishing a perimeter around the site with our temporary site fences. Once the site was secure and safe our team members moved our Brokk Demolition robot onto site. A traffic controller provided by our client to ensure traffic was safe during the project controlled the traffic. Next our team members ran power to the site and established a small site perimeter around this detailed demolition to ensure everyone’s safety on site. Then once our Husqvarna DXR 310 demolition robot was sure that the site was safe he proceeded to demo the bus shelter from underneath. The Husqvarna DXR 310 Demolition Robot was the safest methodology to carry out these works as it could reach up under the shelter that was protruding over the sidewalk below. This made it very safe to demo the support pillars without risking anyone’s safety. Once the platform was fully demolished by the Husqvarna DXR 310 robot our team members extracted all the waste and rubble from the site with our Skip Bins and Tipper Trucks and cleaned up the area to ensure it was ready to be used by the public right away. The Result: The client was very happy with the outcome of the works.
Continue reading
Central Station – Demolition / Strip-out

Central Station – Demolition / Strip-out

Perfect Contracting are currently working for Pebblecrete in Situ PTY Ltd at Central Station. The scope of works includes floor tile demolition and removal in Central Station concourse to allow for installation of new tiles.
Tags: , , , , ,
Continue reading
Leura Train Station – Stair Removal

Leura Train Station – Stair Removal

Perfect Contracting have the expertise and resources to handle any size stair removal project. We get it done!

Perfect Contracting have recently finished stair removal works at Leura Train Station for Gartner Rose PTY Ltd. The weekend works involved the stair removal and disposal from the platform.
Continue reading
Town Hall Station – Update

Town Hall Station – Update

Perfect Contracting have just recently finished Demolition works at Town Hall Station as part of Sydney Trains station refurbishments. Our team members have been working on this annual rolling contract for over 3 whole years without one incident.
Tags: , , , , , ,
Continue reading
Circular Quay Train Station

Circular Quay Train Station

Perfect Contracting were engaged to complete detailed and structural demolition works, including concrete cutting and hammering, penetration openings and lift installations, as part of Sydney Trains major renovation of Circular Quay Train Station. The works involved precise operation of demolition tools, including Hilti demolition saws, Husqvarna coring equipment, Hilti floor grinders, among other specialized equipment.
Tags: , , , ,
Continue reading
Marrickville Train Station

Marrickville Train Station

Perfect Contracting were engaged to complete detailed demolition works and strip out in and around heritage-listed structures. This involved careful planning and operations involved in all works to ensure the integrity of the existing structure is maintained. Involved in the strip out was the removal of existing fittings/fixtures, doors and windows, with additional penetrations required achieved by cutting concrete and detailed demolition of the new openings.
Tags: , ,
Continue reading
Town Hall Concourse Refurbishment

Town Hall Concourse Refurbishment

Perfect Contracting were engaged to complete detailed demolition, including removal of tile and bedding, concrete cutting and grinding, as part of Sydney Trains major renovation of Town Hall Train Station. The works involved precise operation of demolition tools, including Hilti jackhammers, Hilti wall grinders, Hilti floor grinders, oxy cutting equipment, along with various other specialised equipment. The project consisted of the removal of the structural floor above the escalators.
Tags: , , , , , , , ,
Continue reading

Do you need tools & skilled labour?

Call Perfect Hire 1300 737 332.

CALL NOW