Demolition – Marriott Hotel, Circular Quay

Demolition – Marriott Hotel, Circular Quay

Demolition at the Marriott Hotel in Circular Quay

Perfect Contracting completed demolition works for our client Taylor Constructions at the Marriott Hotel in Circular Quay. These works included detailed demolition of the heritage bar, demolition of stairs with the Brokk 90 demolition robot.

First stage of the works involved the detailed demolition of the heritage bar and the demolition of the stairs with the Brokk 90 demolition robot. The Brokk demolition robot was assessed as the safest methodology for the demolition of the stairs. The operator can work from a safe distance and could very accurately demo the stairs with the crusher attachment.

One of the last parts of this project was the removal of some concrete slabs off the driveway. Our team members assessed that the Yanmar 1.7 tonne with the hammer attachment as this would this would be more efficient at hammering out the concrete slab. Firstly though our team members used our Husqvarna demo saws to cut the concrete slab this would ensure a smooth clean finish at the edges and would make it easier to hammer out.

Once all the area was hammered our skilled excavator operator changed out the hammer for the bucket and began to load all waste and rubble into our Isuzu MR 5 tonne tipper truck.

Temporary site fencing was erected throughout the duration of the works to ensure the safety of the public, as the hotel was still a live public site.

Result: Our client Taylor Constructions was delighted with the quality of works carried out.

Perfect Contracting can carry out precise demolition and strip out works with years of experience in the hospitality sector!

Back to Hospitality

Do you need tools & skilled labour?

Call Perfect Hire 1300 737 332.

Join over 10,000 subscribers and

signup to the Perfect Newsletter today.

CALL NOW