All projects

Demolition works at Castle Towers Shopping Centre

Demolition works at Castle Towers Shopping Centre

Project Details

  • Client Construction Control
  • Location Castle Hill
  • Duration July-August 2019

Perfect carried out demolition works at Castle Towers Shopping Centre in Castle Hill. The job involved the structural demolition and soft strip-out of a live shopping centre spreading across the three existing levels, From the green car park up to level 3.

Castle Towers, located in Castle Hill, is one of the largest shopping centres in Australia. The Centre was constructed in 1982 and has been significantly upgraded and extended since.

The primary works undertaken by Perfect included demolition:

  • 6,000m2 of ground slab and ramps,
  • 2,000lm of mechanical ducting,
  • 6,000m2 of existing tenancies,
  • 6,000m2 of terrazzo tile flooring.

Pedestrian awning demolition

This involved the demolition of a 12T steel awning and the associated columns and footings. Perfect provided the methodology to carry out these works next to pedestrian traffic with minimum disturbance for the public. The awning was oxy cut and removed off-site using a 65T crane.

Green carpark slab demolition

This involved the demolition of 6000m2 concrete slab in a low clearance car park (2.1m). 

All work had to be carried out with minimum noise by saw cutting the concrete slabs into blocks and loading them on low sided tippers.

Level 1 Stairs

Perfect directed the procedure carried out for these works inside the open mall area. We also arranged all dust and slurry control measures to leave the site clean and safe for pedestrian traffic the next day. This stage involved concrete stairs demolition, using a Brokk 200 fitted with a special attachment.

Soft strip out works

All floor finishes, ceiling & existing shop fit-outs for 3 levels across 6000m2 for each level.