Stripout – T2 Domestic Sydney Airport

Stripout – T2 Domestic Sydney Airport

Demolition / Stripout – T2 Domestic Sydney Airport

Perfect Contracting recently finished demolition and stripout works for our client HICON Building at Terminal 2 Sydney Domestic Airport as part of the Sydney Airport’s Retail Expansion of the T2 Terminal.

These works involved the demolition and strip out of a number of bathrooms including tile removal, removal of fittings, ceiling tile removal and stud wall removal.

For stage one of the works our team members carried out the demolition and strip out of the first bathroom.

Our team members firstly setup our zip walls to isolate the area and control the dust created. They then began the removal of the bathroom wall and floor tiles using our Hilti TE 1000 Jackhammers with the Tile Smasher attachment.

Once all wall and floor tiles were removed they then removed all bathroom fittings and fixtures. All waste and rubble was loaded into our Tub Bins this allows for a fast removal from the site as our Tub Bins are custom fitted with Fork Lift grips and can easily be loaded into our Skip Bins for a swift removal from site.

All throughout the works our team members used our Hilti VC-40 Dry/Wet Vac’s to vacuum up all excess dust ensuring we kept control of the dust.

All waste and rubble was removed by our Isuzu Hook and Tipper trucks for recycling as we are committed to reaching our goal of recycling over fifty percent of waste and rubble we remove from sites.

Perfect Contracting have the resources and capacity to carry out large commercial strip out works.