Tag: sydney

Clancy Catholic College – Detailed Demolition

Clancy Catholic College – Detailed Demolition

Detailed Demolition – Clancy Catholic College, West Hoxton

Perfect Contracting recently began works for our client Lloyd Group at Clancy Catholic College in West Hoxton. These works included bathroom strip outs, demolition of an awning, demolition of a concrete slab and loading all waste and rubbish out. Our team members began with the changing rooms, stripping out all bathroom stalls and fixtures. Then our team members stripped all wall and floor tiles in the bathroom using our Hilti TE1000 Jackhammers. Next, our team members began the removal of roofing sheets, insulation and external cladding. All team members while removing the roofing sheets wore safety harnesses. Once all roofing sheets and external cladding was removed our excavator operator then pulled down the rest of the structure with our Yanmar 1.7t Excavator. Part of the scope of works included the removal of a concrete slab, our team members used our Husqvarna Ring Saw to cut eh slab into sections. Once the slab was cut through our experienced operator started using our Yanmar 1.7t with hammer attachment to break up the slab. Next, our team members removed the large windows on the north, south, and west of the building. Our team members have years of experience working in education facilities and have the expertise to carry out complex demolition works without disrupting the operational functionality of the building. All waste material was removed from the site by our Isuzu Hook truck with a 15m3 Skip Bins. As we are now GreenStar approved waste removal specialists all waste is sorted by our yard and recycled.

Perfect Contracting have worked with many educational facilities over the years to offer our detailed demolition services!

Tags: , , , , , , , ,
Continue reading
Stripout – T2 Domestic Sydney Airport

Stripout – T2 Domestic Sydney Airport

Demolition / Stripout – T2 Domestic Sydney Airport

Perfect Contracting recently finished demolition and stripout works for our client HICON Building at Terminal 2 Sydney Domestic Airport as part of the Sydney Airport’s Retail Expansion of the T2 Terminal. These works involved the demolition and strip out of a number of bathrooms including tile removal, removal of fittings, ceiling tile removal and stud wall removal. For stage one of the works our team members carried out the demolition and strip out of the first bathroom. Our team members firstly setup our zip walls to isolate the area and control the dust created. They then began the removal of the bathroom wall and floor tiles using our Hilti TE 1000 Jackhammers with the Tile Smasher attachment. Once all wall and floor tiles were removed they then removed all bathroom fittings and fixtures. All waste and rubble was loaded into our Tub Bins this allows for a fast removal from the site as our Tub Bins are custom fitted with Fork Lift grips and can easily be loaded into our Skip Bins for a swift removal from site. All throughout the works our team members used our Hilti VC-40 Dry/Wet Vac’s to vacuum up all excess dust ensuring we kept control of the dust. All waste and rubble was removed by our Isuzu Hook and Tipper trucks for recycling as we are committed to reaching our goal of recycling over fifty percent of waste and rubble we remove from sites.

Perfect Contracting have the resources and capacity to carry out large commercial strip out works.

Tags: , , , , , ,
Continue reading
Demolition / Stripout – Novotel, Darling Harbour

Demolition / Stripout – Novotel, Darling Harbour

Demolition and Strip-out of Novotel at Darling Harbour

Perfect Contracting has just started works at Novotel at darling harbour for our clients Reward Hotel Projects. These works include the demolition and stripout of 200+ rooms, taking them back to base ready for a new fit out. This project is working in a live Hotel, which means the hotel is still fully operational. Our team members began works on the first level stripping out all rooms. The scope of works included, bathroom, ceiling, floor and wall strip-out of each room to a back to base. Our team members began works on the site by installing protective hoardings inside the services elevators that would be used for loading out all waste and rubble. Then they installed carpet protection film to ensure the carpet was not damaged when removing waste and rubble. All waste and rubble is loaded into our Tub Bin system this allows us to remove the waste and rubble very fast as it can be wheeled into the service elevator and loaded into our Skip Bins. This system also allows us to separate all waste types as here at Perfect we are committed to recycling 100% of waste and rubbish as one of major core values is to protect the environment. When our team members have finished the back to base strip-out of the first level then they will proceed with the strip-out of each of the upper levels. The Result: The client is very happy with the progress of the works carried out so far and are impressed with how efficient and professional each and everyone of our team members are.

Perfect Contracting have years of experience in providing demolition and strip-out services for the Hospitality Industry, call today to request a site visit! Call us on 1300 737 332!

Tags: , , , , , , , , , , ,
Continue reading
Detailed Demolition, Concord, Sydney

Detailed Demolition, Concord, Sydney

Detailed demolition and strip-out of a commercial building in Concord, Sydney.

Perfect Contracting are currently working on a detailed demolition and strip-out of a commercial building that has burnt down in concord for All Saints Constructions. The scope of works includes the detailed demolition / strip-out and make safe of the building. Due to the fire the supporting walls were damaged so the first task for our team members is to prop the supporting walls with structural props to ensure the integrity of the building stays intact during the demolition. Once the structural props were in place our team members began stripping out the interior of the building. Our site supervisor ensured all our team members were wearing full PPE at all times to ensure their safety. Next our team members with Working at Heights tickets began the structural demolition of the roof. Once we had safely removed the roof our team members began removing all rubble and waste from the site, which was loaded into our Tub Bin system for easy extraction from the site in our Tipper Trucks. Result: The project was completed on time and within budget and the client was very happy with the works carried out.
Tags: , , , , , ,
Continue reading
Demolition / Stripout – Sydney International Airport

Demolition / Stripout – Sydney International Airport

Demolition and stripout works carried out at Sydney International Airport for EDT Projects PTY Ltd

Perfect Contracting recently completed a project at Sydney International Airport for EDT Projects PTY Ltd. The works involved the demolition and strip-out of a section of the Sydney International Airport.
Tags: , , ,
Continue reading
Brokk Demolition Robot – 165 Philips St

Brokk Demolition Robot – 165 Philips St

Perfect Contracting are currently using a Brokk Demolition Robot to demolish the stairwell at 165 Philips St. We needed the demolition power of a 15 ton excavator but due to the project being with load and size restrictions, it is impossible to get a excavator of that size into the building. This is where the Brokk 90 comes in; the Brokk 90 is one of the most versatile machines available for demolition in restricted areas. When the job has to be done in a confined space, size really does matter. The goal is to bring as much power and flexibility as possible to the site, and the Brokk 90 achieves it.
Tags: , , , , , , ,