Tag: strip-out

3 Level Detailed Strip out – TAFE, Ultimo

3 Level Detailed Strip out – TAFE, Ultimo

3 Level Strip out – TAFE Ultimo, Sydney

Perfect Contracting have recently started demolition and stripout works for our client Rork Projects at TAFE Ultimo. These works involve carpet tile removal, gyprock walls, and glass removal. This building is classed as a historical building so it requires a technical demolition and stripout taking extra care to preserve all historical features such as door frames, stairs cases, windowsills, and chandeliers. As the lift in the building was small and is only classed as a personal lift it cannot be used as goods lift. It was assessed by our project manager that the most efficient way of removing all waste material from the building would be to use a scissor lift and skip bin at the side of the building and hand load all material manually into the skip. Our scissor lift operators have their EWP (Elevated Working Platform) tickets and are wearing safety harnesses and full PPE (Personal Protective Equipment) to ensure their safety. For the removal of the glass walls, our team members used our aluminium scaffold and suction pads to manually remove each piece of glass. The carpet tiles are being stripped on each floor and removed via the scissor lift. Special protection was installed on all staircases and balustrades by our client to ensure they remained intact throughout the duration of the project. For this project, we used our brand new 30m3 Skip Bin as this would allow us to load more material out each time. All waste and rubbish material is being loaded out by our new Isuzu Hook truck for recycling. We are also now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialises in detailed heritage demolition works, with years of expertise working with some of the oldest buildings in Australia.

Tags: , , , , , ,
Continue reading
Detailed Demolition – Balmain, Sydney

Detailed Demolition – Balmain, Sydney

3 Level Detailed Demolition Project - Balmain

Our team members have recently started demolition works for our client Lloyd Group at 73 Beattie St in Balmain. These works involve the detailed three level structural demolition of a heritage building. As this building is historical this requires very technical and precise demolition works to be carried out. Firstly our team members started stripping out offices on the 3rd floor at the back of the building leaving the heritage trusses and roof. Next our team members are beginning works at the front of the building where our client requires the removal of the concrete floor slab and 2nd level to be brought down to ground level. For the removal of the concrete slab it was assessed that the safest and most efficient methodology would be to make a series of deep cuts in the slab both horizontally and vertically with a road saw and then to use our 5ton excavator to remove the slab in pieces. The front facade of the building is also heritage so this must remain intact. Our team members will be back propping the façade with tilt props to ensure it remains intact throughout the entirety of the demolition works. The works being carried out by our team members at the moment are part of stage one of works to be completed for our client. There is three stages in total as this is a very detailed heritage building demolition we take the upmost care in ensuring all heritage structures remain intact. All waste and rubbish material is being loaded out by our Isuzu Hook trucks for recycling. We are now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialise in detailed heritage demolition works, with years of expertise working with some of the oldest building in Australia.

Tags: , , , , , , ,
Continue reading
Asbestos Removal – Knox Grammar School, Wahroonga

Asbestos Removal – Knox Grammar School, Wahroonga

Perfect Contracting finished asbestos removal works at Knox Grammar School in Wahroonga for our client Maintlink. The works included asbestos removal works, removal of wall and floor tiles and removal of hazardous lead paint from the roof.
Tags: , , , , , , , ,
Continue reading
Half House Demolition – Leichhardt

Half House Demolition – Leichhardt

  Our team members have recently finished half house demolition works for our client Pioneer Projects in Leichhardt, Sydney. The scope of works involved removal of roof sheets, timber frame and insulation. Removal of gyprock walls, removal of bathroom tiles and removal of some external brick walls. Firstly our site supervisor met with our client’s representative on site to discuss the full scope of works and get a better understanding on their requirements. Once they were informed of the work to be carried out our team members began by establishing all tools and equipment on site. After the toolbox talk from our supervisor of the potential hazards on site our team members began with the bathroom tile removal. The bathroom tiles were removed using out Hilti TE800 Jackhammers and Tile Smasher attachments. Once all wall and floor tiles were stripped our team members began loading out the waste and rubble with hand bins into our Isuzu Tipper Truck. Access for this project was limited as there was only a narrow pathway at the side of the house. Next our team members began breaking the concrete slab in the laundry, as per the client request. This was done using our bigger Hilti TE1500 and TE3000 Jackhammers that are designed for breaking up heavy concrete slabs. The final stage of this project was the removal of four external walls at the rear of the house. Firstly our more experienced team members made precise vertical cuts along the wall on both sides of the brick with our Husqvarna K9600 Demolition Saw. This ensures that when the wall was being removed that the adjoining walls are not affected. Once all work was complete on this project all our team members loaded out all waste and rubble into out Isuzu Tipper Truck for recycling.

Perfect Contracting have the knowledge and experience to carry out precise residential demolition works

Tags: , , , , , , ,
Continue reading
Stripout – T2 Domestic Sydney Airport

Stripout – T2 Domestic Sydney Airport

Demolition / Stripout – T2 Domestic Sydney Airport

Perfect Contracting recently finished demolition and stripout works for our client HICON Building at Terminal 2 Sydney Domestic Airport as part of the Sydney Airport’s Retail Expansion of the T2 Terminal. These works involved the demolition and strip out of a number of bathrooms including tile removal, removal of fittings, ceiling tile removal and stud wall removal. For stage one of the works our team members carried out the demolition and strip out of the first bathroom. Our team members firstly setup our zip walls to isolate the area and control the dust created. They then began the removal of the bathroom wall and floor tiles using our Hilti TE 1000 Jackhammers with the Tile Smasher attachment. Once all wall and floor tiles were removed they then removed all bathroom fittings and fixtures. All waste and rubble was loaded into our Tub Bins this allows for a fast removal from the site as our Tub Bins are custom fitted with Fork Lift grips and can easily be loaded into our Skip Bins for a swift removal from site. All throughout the works our team members used our Hilti VC-40 Dry/Wet Vac’s to vacuum up all excess dust ensuring we kept control of the dust. All waste and rubble was removed by our Isuzu Hook and Tipper trucks for recycling as we are committed to reaching our goal of recycling over fifty percent of waste and rubble we remove from sites.

Perfect Contracting have the resources and capacity to carry out large commercial strip out works.

Tags: , , , , , ,
Continue reading
Demolition / Stripout – Novotel, Darling Harbour

Demolition / Stripout – Novotel, Darling Harbour

Demolition and Strip-out of Novotel at Darling Harbour

Perfect Contracting has just started works at Novotel at darling harbour for our clients Reward Hotel Projects. These works include the demolition and stripout of 200+ rooms, taking them back to base ready for a new fit out. This project is working in a live Hotel, which means the hotel is still fully operational. Our team members began works on the first level stripping out all rooms. The scope of works included, bathroom, ceiling, floor and wall strip-out of each room to a back to base. Our team members began works on the site by installing protective hoardings inside the services elevators that would be used for loading out all waste and rubble. Then they installed carpet protection film to ensure the carpet was not damaged when removing waste and rubble. All waste and rubble is loaded into our Tub Bin system this allows us to remove the waste and rubble very fast as it can be wheeled into the service elevator and loaded into our Skip Bins. This system also allows us to separate all waste types as here at Perfect we are committed to recycling 100% of waste and rubbish as one of major core values is to protect the environment. When our team members have finished the back to base strip-out of the first level then they will proceed with the strip-out of each of the upper levels. The Result: The client is very happy with the progress of the works carried out so far and are impressed with how efficient and professional each and everyone of our team members are.

Perfect Contracting have years of experience in providing demolition and strip-out services for the Hospitality Industry, call today to request a site visit! Call us on 1300 737 332!

Tags: , , , , , , , , , , ,
Continue reading
Office Strip-out, Avaya House

Office Strip-out, Avaya House

Office Strip-out in Macquarie Park

Perfect Contracting were contracted by INAPHASE to complete an office strip-out and rubbish removal works at Avaya House in Macquarie Park. The works included the removal of workstations, carpet removal and demolition of partition walls.
Tags: , , , , ,
Continue reading
2 Level Office Strip-out, North Ryde Sydney

2 Level Office Strip-out, North Ryde Sydney

Perfect Contracting recently finished the strip-out of two office levels for Intrec Management PTY Ltd in North Ryde. All waste was separated and removed from site for recycling. Perfect Contracting aim to recycle 100% of waste removed from sites.
Tags: , , , , ,
Continue reading
Town Hall Station – Update

Town Hall Station – Update

Perfect Contracting have just recently finished Demolition works at Town Hall Station as part of Sydney Trains station refurbishments. Our team members have been working on this annual rolling contract for over 3 whole years without one incident.
Tags: , , , , , ,
Continue reading
Strip Out, Surry Hills, 10-14 Waterloo St

Strip Out, Surry Hills, 10-14 Waterloo St

Perfect Contracting were hired by Mainbrace Constructions to perform demolition and strip-out works of three floors at 10-14 Waterloo St, Surry Hills. Level A1 is fully stripped-out and we have completed all works on Level A1 already. This project included the removal of over 670m2 of carpet tiles including underlying glue. Strip-out of the Male / Female toilets including tiles, wall tiles and splash-back including render which comes out with tiles, toilet partitions, doors and all toilet fixtures and fittings. Perfect were also contracted to remove 733m2 of existing ceiling tiles and grids.
Tags: , , , , , , , ,
Continue reading

Do you need tools & skilled labour?

Call Perfect Hire 1300 737 332.

Join over 10,000 subscribers and

signup to the Perfect Newsletter today.

CALL NOW