Tag: strip-out

Demolition – Villawood

Demolition – Villawood

Perfect Contracting just started demolition works for our client Urban Fitouts at a warehouse in Villawood. The extent of works for this project involves:
  • Removal of all loose furniture and rubbish from the office, canteens, changing rooms and bathrooms including workstations, chairs, lockers, tables, and appliances.
  • Removal of all racking and platforms in the warehouse area to leave the space empty.
  • Removal 64Lm of existing gantry beams.
  • Cut and dispose redundant pipes hanging down from the awning and terminate at the roof level.
  • Demolish existing slab above the underground storage tank.
  • Removal of existing underground storage tank.
Our client also requested the removal of redundant gantry crane rail beams. Our engineers identified the safest and most efficient methodology to remove these beams was to use a 20T Mobile Crane to hold the weight of the beams while our experienced rigger disconnected the beams from an elevated working platform. In addition, our client also requested removal and disposal of an underground tank, these works included the demolition of the existing slab, removal of the tank and the back fill the hole and concrete hard stand. Our experienced operators will carry out these works with our large Sumitomo 24T Excavator. Through the duration of the works, all waste materials are carefully being separated from our team members into separate skips so we can recycle all material removed from the site. As Perfect Contracting is now a GreenStar accredited and committed to reaching our goal of recycling over 60% of the material by end of Q4 2018.

Perfect Contracting can carry out large factory and warehouse demolition and strip out projects. Call our office today to discuss your project!

Tags: , , ,
Continue reading
Asbestos Removal – Earlwood

Asbestos Removal – Earlwood

Perfect Contracting recently finished asbestos removal works for our client Pioneer Projects at a residential house in Earlwood. These works involved the removal of asbestos from ceilings and walls of a residential house. Our team members began by installing protection and cordoning off the area from the rest of the site to prevent spread of contaminated material. Next our team members installed all appropriate asbestos removal signage and safety barriers. Once the site was secure and protection was installed our team members wearing all appropriate asbestos PPE with full-face respirators, began dismantling and demolishing the ceiling and walls. All contaminated material was carefully double bagged in marked 200um thick asbestos removal disposal bags and stockpiled for removal as our team members would remove all PPE to prevent spread of contaminated material. Once all contaminated material had been carefully double bagged our team members and carefully loaded onto our Isuzu tipper truck for removal. All contaminated material was disposed of with a licensed asbestos waste management facility.

Perfect Contracting have carried out hundreds of asbestos removal projects all across Sydney. Call our office today!

Tags: , , , , ,
Continue reading
Demolition / Asbestos Removal – Burwood

Demolition / Asbestos Removal – Burwood

Demolition / Asbestos Removal – Railway Parade, Burwood

Perfect Contracting are currently carrying out detailed demolition works for our client Ghossayn Group at Burwood. These works involve the detailed strip out and asbestos removal of an entire apartment block. Firstly our team members began by stripping the entire apartment block of all furniture and fittings. Then they began to remove the gyprock that was applied directly to the concrete subfloor. This proved extra tricky, as there was no ceiling joists and the gyprock as stuck with adhesive directly to the slab. This made the gyprock extra hard to strip from the ceilings and walls. Our team members used our Hilti TE70 and TE80 Jackhammers with title smasher blade attachments to get under the gyprock; they also used our cordless Hilti Reciprocating Saws to cut pieces at the edges. Once all walls and ceilings were stripped, our team members began clearing the roof tiles off the roof and dismantling the wooden beams of the roof. Our team members stockpiled all wood from the roof separately. This meant we could easily remove a number of 100% recyclable timber loads. As we are ‘GreenStar’ accredited we are always looking to recycle wherever we can. We always educate our clients the benefits of recycling when carrying out large projects like this, as it can end up saving them thousands. Once the internal strip out was complete and roof dismantled, our trained Asbestos Removal Supervisors began removing the bonded asbestos from the site. Using a large boom lift and the necessary protective equipment each piece was carefully removed and packaged in high impact LDPE 200um thick asbestos disposal bags. Asbestos monitoring equipment was set up around the parameter of the site to ensure the safety of the surrounding area throughout the entire asbestos removal process to ensure the safety of the surrounding areas.

Perfect Contracting have the assets and capacity to carry out large-scale demolition projects with short turn around times. Call our office today!

Tags: , , , , , , ,
Continue reading
Demolition – Parramatta Train Station

Demolition – Parramatta Train Station

Demolition – Parramatta Train Station

Perfect Contracting recently completed detailed demolition works for our client Infrastruction Group on a possession weekend at Parramatta train station. These works involved the removal of floor tiles from the concourse. The scope of work from our client was to remove over 179m2 of tiles including up to 30mm of bedding on Platform 3. This also included removing existing grey and yellow tactiles from Platform 2. All these works were carried out during a possession weekend. For these works we had over fifteen team members working on the concourse. The majority of the tile was removed by out 1.7t mini-excavator and experienced operator. The rest of our team members carried out the detailing using our Hilti TE1000 and TE1500 Jackhammers. All the works were supervised by our experienced site super visor to ensure the works were carried out in the safest possible manner. All our team members had RIW (Rail Industry Worker) tickets and all the necessary inductions needed to carry out the works on the concourse. We also supplied our client with our skip bins and carried out the load out during the weekend. Result: Our client was delighted with the quality of the works carried out and professionalism of our team members.

Perfect Contracting have the experience and capabilities to carry out detailed Infrastructure Demolition projects. Call our office today!

Tags: , , , , ,
Continue reading
Clancy Catholic College – Detailed Demolition

Clancy Catholic College – Detailed Demolition

Detailed Demolition – Clancy Catholic College, West Hoxton

Perfect Contracting recently began works for our client Lloyd Group at Clancy Catholic College in West Hoxton. These works included bathroom strip outs, demolition of an awning, demolition of a concrete slab and loading all waste and rubbish out. Our team members began with the changing rooms, stripping out all bathroom stalls and fixtures. Then our team members stripped all wall and floor tiles in the bathroom using our Hilti TE1000 Jackhammers. Next, our team members began the removal of roofing sheets, insulation and external cladding. All team members while removing the roofing sheets wore safety harnesses. Once all roofing sheets and external cladding was removed our excavator operator then pulled down the rest of the structure with our Yanmar 1.7t Excavator. Part of the scope of works included the removal of a concrete slab, our team members used our Husqvarna Ring Saw to cut eh slab into sections. Once the slab was cut through our experienced operator started using our Yanmar 1.7t with hammer attachment to break up the slab. Next, our team members removed the large windows on the north, south, and west of the building. Our team members have years of experience working in education facilities and have the expertise to carry out complex demolition works without disrupting the operational functionality of the building. All waste material was removed from the site by our Isuzu Hook truck with a 15m3 Skip Bins. As we are now GreenStar approved waste removal specialists all waste is sorted by our yard and recycled.

Perfect Contracting have worked with many educational facilities over the years to offer our detailed demolition services!

Tags: , , , , , , , ,
Continue reading
Macquarie University – Detailed Demolition

Macquarie University – Detailed Demolition

Macquarie University - Detailed Demolition

Perfect Contracting recently began works for our client Taylor Constructions at Macquarie University in Sydney. These works included removal of a brick wall and a ceiling strip out. Our team members began by carefully removing the brick wall using our Hilti TE1000 Jackhammers with the chisel attachment. Removing all the rubble using our Tub Bin system allows us to swiftly load out all the waste into our Hook Trucks in the loading area. Next our team members began by carefully dismantling the ceiling tiles being carefully to leave all services intact. All waste and rubble was loaded out into our Isuzu Tipper trucks and removed for recycling. Perfect Contracting have years of experience working in education facilities and have the expertise to carry out complex demolition works without disrupting the operational functionality of the building. All waste material was removed from the site by our Isuzu Hook truck with a 15m3 Skip Bins. As we are now GreenStar approved waste removal specialists all waste is sorted at our yard and recycled.

Perfect Contracting have worked with many educational facilities over the years to offer our detailed demolition services!

Tags: , , , , ,
Continue reading
3 Level Detailed Strip out – TAFE, Ultimo

3 Level Detailed Strip out – TAFE, Ultimo

3 Level Strip out – TAFE Ultimo, Sydney

Perfect Contracting have recently started demolition and stripout works for our client Rork Projects at TAFE Ultimo. These works involve carpet tile removal, gyprock walls, and glass removal. This building is classed as a historical building so it requires a technical demolition and stripout taking extra care to preserve all historical features such as door frames, stairs cases, windowsills, and chandeliers. As the lift in the building was small and is only classed as a personal lift it cannot be used as goods lift. It was assessed by our project manager that the most efficient way of removing all waste material from the building would be to use a scissor lift and skip bin at the side of the building and hand load all material manually into the skip. Our scissor lift operators have their EWP (Elevated Working Platform) tickets and are wearing safety harnesses and full PPE (Personal Protective Equipment) to ensure their safety. For the removal of the glass walls, our team members used our aluminium scaffold and suction pads to manually remove each piece of glass. The carpet tiles are being stripped on each floor and removed via the scissor lift. Special protection was installed on all staircases and balustrades by our client to ensure they remained intact throughout the duration of the project. For this project, we used our brand new 30m3 Skip Bin as this would allow us to load more material out each time. All waste and rubbish material is being loaded out by our new Isuzu Hook truck for recycling. We are also now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialises in detailed heritage demolition works, with years of expertise working with some of the oldest buildings in Australia.

Tags: , , , , , ,
Continue reading
Detailed Demolition – Balmain, Sydney

Detailed Demolition – Balmain, Sydney

3 Level Detailed Demolition Project - Balmain

Our team members have recently started demolition works for our client Lloyd Group at 73 Beattie St in Balmain. These works involve the detailed three level structural demolition of a heritage building. As this building is historical this requires very technical and precise demolition works to be carried out. Firstly our team members started stripping out offices on the 3rd floor at the back of the building leaving the heritage trusses and roof. Next our team members are beginning works at the front of the building where our client requires the removal of the concrete floor slab and 2nd level to be brought down to ground level. For the removal of the concrete slab it was assessed that the safest and most efficient methodology would be to make a series of deep cuts in the slab both horizontally and vertically with a road saw and then to use our 5ton excavator to remove the slab in pieces. The front facade of the building is also heritage so this must remain intact. Our team members will be back propping the façade with tilt props to ensure it remains intact throughout the entirety of the demolition works. The works being carried out by our team members at the moment are part of stage one of works to be completed for our client. There is three stages in total as this is a very detailed heritage building demolition we take the upmost care in ensuring all heritage structures remain intact. All waste and rubbish material is being loaded out by our Isuzu Hook trucks for recycling. We are now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialise in detailed heritage demolition works, with years of expertise working with some of the oldest building in Australia.

Tags: , , , , , , ,
Continue reading
Asbestos Removal – Knox Grammar School, Wahroonga

Asbestos Removal – Knox Grammar School, Wahroonga

Perfect Contracting finished asbestos removal works at Knox Grammar School in Wahroonga for our client Maintlink. The works included asbestos removal works, removal of wall and floor tiles and removal of hazardous lead paint from the roof.
Tags: , , , , , , , ,
Continue reading
Half House Demolition – Leichhardt

Half House Demolition – Leichhardt

  Our team members have recently finished half house demolition works for our client Pioneer Projects in Leichhardt, Sydney. The scope of works involved removal of roof sheets, timber frame and insulation. Removal of gyprock walls, removal of bathroom tiles and removal of some external brick walls. Firstly our site supervisor met with our client’s representative on site to discuss the full scope of works and get a better understanding on their requirements. Once they were informed of the work to be carried out our team members began by establishing all tools and equipment on site. After the toolbox talk from our supervisor of the potential hazards on site our team members began with the bathroom tile removal. The bathroom tiles were removed using out Hilti TE800 Jackhammers and Tile Smasher attachments. Once all wall and floor tiles were stripped our team members began loading out the waste and rubble with hand bins into our Isuzu Tipper Truck. Access for this project was limited as there was only a narrow pathway at the side of the house. Next our team members began breaking the concrete slab in the laundry, as per the client request. This was done using our bigger Hilti TE1500 and TE3000 Jackhammers that are designed for breaking up heavy concrete slabs. The final stage of this project was the removal of four external walls at the rear of the house. Firstly our more experienced team members made precise vertical cuts along the wall on both sides of the brick with our Husqvarna K9600 Demolition Saw. This ensures that when the wall was being removed that the adjoining walls are not affected. Once all work was complete on this project all our team members loaded out all waste and rubble into out Isuzu Tipper Truck for recycling.

Perfect Contracting have the knowledge and experience to carry out precise residential demolition works

Tags: , , , , , , ,