Tag: Removal

Detailed Demolition – Balmain, Sydney

Detailed Demolition – Balmain, Sydney

3 Level Detailed Demolition Project - Balmain

Our team members have recently started demolition works for our client Lloyd Group at 73 Beattie St in Balmain. These works involve the detailed three level structural demolition of a heritage building. As this building is historical this requires very technical and precise demolition works to be carried out. Firstly our team members started stripping out offices on the 3rd floor at the back of the building leaving the heritage trusses and roof. Next our team members are beginning works at the front of the building where our client requires the removal of the concrete floor slab and 2nd level to be brought down to ground level. For the removal of the concrete slab it was assessed that the safest and most efficient methodology would be to make a series of deep cuts in the slab both horizontally and vertically with a road saw and then to use our 5ton excavator to remove the slab in pieces. The front facade of the building is also heritage so this must remain intact. Our team members will be back propping the façade with tilt props to ensure it remains intact throughout the entirety of the demolition works. The works being carried out by our team members at the moment are part of stage one of works to be completed for our client. There is three stages in total as this is a very detailed heritage building demolition we take the upmost care in ensuring all heritage structures remain intact. All waste and rubbish material is being loaded out by our Isuzu Hook trucks for recycling. We are now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialise in detailed heritage demolition works, with years of expertise working with some of the oldest building in Australia.

Tags: , , , , , , ,
Continue reading
Half House Demolition – Leichhardt

Half House Demolition – Leichhardt

  Our team members have recently finished half house demolition works for our client Pioneer Projects in Leichhardt, Sydney. The scope of works involved removal of roof sheets, timber frame and insulation. Removal of gyprock walls, removal of bathroom tiles and removal of some external brick walls. Firstly our site supervisor met with our client’s representative on site to discuss the full scope of works and get a better understanding on their requirements. Once they were informed of the work to be carried out our team members began by establishing all tools and equipment on site. After the toolbox talk from our supervisor of the potential hazards on site our team members began with the bathroom tile removal. The bathroom tiles were removed using out Hilti TE800 Jackhammers and Tile Smasher attachments. Once all wall and floor tiles were stripped our team members began loading out the waste and rubble with hand bins into our Isuzu Tipper Truck. Access for this project was limited as there was only a narrow pathway at the side of the house. Next our team members began breaking the concrete slab in the laundry, as per the client request. This was done using our bigger Hilti TE1500 and TE3000 Jackhammers that are designed for breaking up heavy concrete slabs. The final stage of this project was the removal of four external walls at the rear of the house. Firstly our more experienced team members made precise vertical cuts along the wall on both sides of the brick with our Husqvarna K9600 Demolition Saw. This ensures that when the wall was being removed that the adjoining walls are not affected. Once all work was complete on this project all our team members loaded out all waste and rubble into out Isuzu Tipper Truck for recycling.

Perfect Contracting have the knowledge and experience to carry out precise residential demolition works

Tags: , , , , , , ,
Continue reading
Demolition / Stripout – Novotel, Darling Harbour

Demolition / Stripout – Novotel, Darling Harbour

Demolition and Strip-out of Novotel at Darling Harbour

Perfect Contracting has just started works at Novotel at darling harbour for our clients Reward Hotel Projects. These works include the demolition and stripout of 200+ rooms, taking them back to base ready for a new fit out. This project is working in a live Hotel, which means the hotel is still fully operational. Our team members began works on the first level stripping out all rooms. The scope of works included, bathroom, ceiling, floor and wall strip-out of each room to a back to base. Our team members began works on the site by installing protective hoardings inside the services elevators that would be used for loading out all waste and rubble. Then they installed carpet protection film to ensure the carpet was not damaged when removing waste and rubble. All waste and rubble is loaded into our Tub Bin system this allows us to remove the waste and rubble very fast as it can be wheeled into the service elevator and loaded into our Skip Bins. This system also allows us to separate all waste types as here at Perfect we are committed to recycling 100% of waste and rubbish as one of major core values is to protect the environment. When our team members have finished the back to base strip-out of the first level then they will proceed with the strip-out of each of the upper levels. The Result: The client is very happy with the progress of the works carried out so far and are impressed with how efficient and professional each and everyone of our team members are.

Perfect Contracting have years of experience in providing demolition and strip-out services for the Hospitality Industry, call today to request a site visit! Call us on 1300 737 332!

Tags: , , , , , , , , , , ,
Continue reading
Office Strip-out, Avaya House

Office Strip-out, Avaya House

Office Strip-out in Macquarie Park

Perfect Contracting were contracted by INAPHASE to complete an office strip-out and rubbish removal works at Avaya House in Macquarie Park. The works included the removal of workstations, carpet removal and demolition of partition walls.
Tags: , , , , ,
Continue reading
Strip Out, Surry Hills, 10-14 Waterloo St

Strip Out, Surry Hills, 10-14 Waterloo St

Perfect Contracting were hired by Mainbrace Constructions to perform demolition and strip-out works of three floors at 10-14 Waterloo St, Surry Hills. Level A1 is fully stripped-out and we have completed all works on Level A1 already. This project included the removal of over 670m2 of carpet tiles including underlying glue. Strip-out of the Male / Female toilets including tiles, wall tiles and splash-back including render which comes out with tiles, toilet partitions, doors and all toilet fixtures and fittings. Perfect were also contracted to remove 733m2 of existing ceiling tiles and grids.
Tags: , , , , , , , ,
Continue reading
International House, Sydney University

International House, Sydney University

Sydney University undertook major renovations of its International House accommodation. Perfect Contracting were engaged to complete internal demolition works, as well as soft strip out of existing fittings and fixtures. Perfect Contracting provided additional tradesman services after contract works, including carpentry works for installations and rendering services for wall finishes. A complete waste management plan was implemented to service all waste removal requirements of this major load out project.
Tags: , , , ,
Continue reading
Macquarie University

Macquarie University

Macquarie University undertook major renovations of one of the 3 storey buildings on site. Perfect Contracting were engaged to complete internal demolition works, as well as soft strip out of existing fittings and fixtures. Two crews were run to operator a day and night shift to ensure this project was completed efficiently and effectively.
Tags: , , ,
Continue reading
Birrong Girls High School

Birrong Girls High School

Perfect Contracting were engaged to complete the full demolition and removal of a single storey building. The works involved required concrete cutting of certain sections of the building, followed by the operation of excavator to assist in demolition of the building. Asbestos was present at the site so careful planning and removal of the asbestos contaminated materials were required, along with safe disposal.
Tags: , , , , , , , , , , ,
Continue reading
165 Philips Street, Sydney

165 Philips Street, Sydney

Perfect Contracting were contracted to carry out Demolition works at NSW NRL Members Club at 165 Philips St in the CBD. This massive project involves the strip-out of ten floors in the NSW NRL members club next to the Travel Lodge.
Tags: , , ,
Continue reading
Haverick Meats, Banksmeadow, Sydney

Haverick Meats, Banksmeadow, Sydney

Perfect Contracting were engaged by Haverick Meats and to carry out Demolition works at Haverick Meats factory at Banksmeadow. The work involved a back to base stripping out of the entire factory after there was an extensive fire damage, this included hygenic removal of all remaining meat in the factory, removal of steel shelving within the factory.
Tags: , , , , , , , , , ,
Continue reading