Tag: props

Detailed Demolition – Balmain, Sydney

Detailed Demolition – Balmain, Sydney

3 Level Detailed Demolition Project - Balmain

Our team members have recently started demolition works for our client Lloyd Group at 73 Beattie St in Balmain. These works involve the detailed three level structural demolition of a heritage building. As this building is historical this requires very technical and precise demolition works to be carried out. Firstly our team members started stripping out offices on the 3rd floor at the back of the building leaving the heritage trusses and roof. Next our team members are beginning works at the front of the building where our client requires the removal of the concrete floor slab and 2nd level to be brought down to ground level. For the removal of the concrete slab it was assessed that the safest and most efficient methodology would be to make a series of deep cuts in the slab both horizontally and vertically with a road saw and then to use our 5ton excavator to remove the slab in pieces. The front facade of the building is also heritage so this must remain intact. Our team members will be back propping the façade with tilt props to ensure it remains intact throughout the entirety of the demolition works. The works being carried out by our team members at the moment are part of stage one of works to be completed for our client. There is three stages in total as this is a very detailed heritage building demolition we take the upmost care in ensuring all heritage structures remain intact. All waste and rubbish material is being loaded out by our Isuzu Hook trucks for recycling. We are now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialise in detailed heritage demolition works, with years of expertise working with some of the oldest building in Australia.

Tags: , , , , , , ,
Continue reading
Detailed Demolition, Concord, Sydney

Detailed Demolition, Concord, Sydney

Detailed demolition and strip-out of a commercial building in Concord, Sydney.

Perfect Contracting are currently working on a detailed demolition and strip-out of a commercial building that has burnt down in concord for All Saints Constructions. The scope of works includes the detailed demolition / strip-out and make safe of the building. Due to the fire the supporting walls were damaged so the first task for our team members is to prop the supporting walls with structural props to ensure the integrity of the building stays intact during the demolition. Once the structural props were in place our team members began stripping out the interior of the building. Our site supervisor ensured all our team members were wearing full PPE at all times to ensure their safety. Next our team members with Working at Heights tickets began the structural demolition of the roof. Once we had safely removed the roof our team members began removing all rubble and waste from the site, which was loaded into our Tub Bin system for easy extraction from the site in our Tipper Trucks. Result: The project was completed on time and within budget and the client was very happy with the works carried out.
Tags: , , , , , ,
Continue reading
Structural Demolition – 122 Long St, Smithfield

Structural Demolition – 122 Long St, Smithfield

Structural Demolition and strip-out in Smithfield, Sydney

Perfect Contracting just finished major structural demolition at Smithfield for Johns Lyng Group PTY Ltd. This involved the demolition, strip-out and structural make safe of a factory unit in Smithfield. Firstly our team members cordoned off the site to ensure the safety of the public throughout the project. Next the client’s engineers assessed the structure and concluded that the outer supporting walls would need to be reinforced with steel props. This would ensure the integrity of the structure was safe to complete the strip-out works. When the props were in place the client’s engineer assessed the site and signed off that the structure was now structurally sound. Once our team members had the all clear the internal strip-out works began. We used our 1.7ton Yanmar Excavator with a skilled operator to strip-out all the factory-shelving units. All the waste and rubbish was loaded into our Isszu Tipper Trucks so we could quickly remove the waste from site. When the internal strip-out was complete we then began works on removing the galvanised roofing sheets. We used an elevated working platform and all our team members had Working at Heights competency and full PPE to ensure their safety. Once all roofing sheets were removed from site, we then began to remove the structural steel girders as the client for this particular project requested it. A mobile crane was used to take the supporting weight off the girders. Once the crane was securely attached our team members then used an elevated working platform to oxy cut the bolts either side of the girder so it could be removed and safely lowered onto the truck for load-out. Result: The project was completed on time, within budget and the client was very happy with the outcome of the works involved.
Tags: , , , , ,
Continue reading