Tag: propping

Detailed Demolition – Balmain, Sydney

Detailed Demolition – Balmain, Sydney

3 Level Detailed Demolition Project - Balmain

Our team members have recently started demolition works for our client Lloyd Group at 73 Beattie St in Balmain. These works involve the detailed three level structural demolition of a heritage building. As this building is historical this requires very technical and precise demolition works to be carried out. Firstly our team members started stripping out offices on the 3rd floor at the back of the building leaving the heritage trusses and roof. Next our team members are beginning works at the front of the building where our client requires the removal of the concrete floor slab and 2nd level to be brought down to ground level. For the removal of the concrete slab it was assessed that the safest and most efficient methodology would be to make a series of deep cuts in the slab both horizontally and vertically with a road saw and then to use our 5ton excavator to remove the slab in pieces. The front facade of the building is also heritage so this must remain intact. Our team members will be back propping the façade with tilt props to ensure it remains intact throughout the entirety of the demolition works. The works being carried out by our team members at the moment are part of stage one of works to be completed for our client. There is three stages in total as this is a very detailed heritage building demolition we take the upmost care in ensuring all heritage structures remain intact. All waste and rubbish material is being loaded out by our Isuzu Hook trucks for recycling. We are now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialise in detailed heritage demolition works, with years of expertise working with some of the oldest building in Australia.

Tags: , , , , , , ,
Continue reading
Haverick Meats, Banksmeadow, Sydney

Haverick Meats, Banksmeadow, Sydney

Perfect Contracting were engaged by Haverick Meats and to carry out Demolition works at Haverick Meats factory at Banksmeadow. The work involved a back to base stripping out of the entire factory after there was an extensive fire damage, this included hygenic removal of all remaining meat in the factory, removal of steel shelving within the factory.
Tags: , , , , , , , , , ,
Continue reading
The Vibe Hotel, Rushcutters Bay, Syndey, 2011

The Vibe Hotel, Rushcutters Bay, Syndey, 2011

Hotel demolition and stripout The Vibe Hotel, Rushcutters Bay - Sydney

Perfect Contracting were engaged by Lemko and TOGA Group to carry out Demolition works at The Vibe Hotel at Rushcutters Bay. The work involved a back to base stripping out 253 guest rooms, which included the removal of Carpet, Bed Heads, TV Cabinet Units and Small Tile Removal in Bathroom's. Perfect Contracting provided a team of eleven skilled demolition and rubbish removal labourers to carry out the works. All work was supervised by our Site Supervisor Moustapha Merhi to ensure safety of our team members and efficiency while carrying out the work.
Tags: , , , , , , , , , , , ,
Continue reading