Tag: propping

8 Level Demolition Project – Pyrmont

8 Level Demolition Project – Pyrmont

8 Level Demolition Project - Pyrmont

Perfect Contracting have commenced stage one of demolition works for our client Infinity Group, in Pyrmont. This demolition project is to be carried out over 8 levels and involve over two hundred concrete penetrations through the floor slabs; three lift removals, heritage window removals, asbestos removal and structural steel demolition. Firstly, our experienced riggers performed a lift removal at the north side of the building. This involved the removal of the lift car and lining, shaft core walls and existing lift motor. Our rigger then installed certified hoisting equipment so we can use the lift allow us to transport our 0.8ton Yanmar Mini-Excavator with the hammer attachment to speed up the wall and floor penetrations on the upper levels. While the lift shaft on the north side of the building is being rigged out as a material hoist, our other team members are demolishing the concrete slab on ground level. This involves the removal of 750m2 of the existing concrete slab, which is 150mmthick. To perform these works, our experienced operators are using our Yanmar 1.7ton Mini-Excavator with hammer attachment and our large Bobcat S590 Loader to hammer out the slab and load out the waste and rubble directly to our 15m3 skip bins. All waste and rubble are to be extracted from the site via our Isuzu hook trucks for recycling. As soon as the lift at the north side of the building was fitted with our winch, our team members lifted our 0.8ton Yanmar Mini-Excavator to Level 8 to begin demolition works. Our team members also hoisted our two Bobcat S70’s to load out all the waste and rubble. As this site is a heritage structure, our team members are taking a duty of care when carrying out all the demolition works to ensure all heritage structures remain intact throughout the demolition works. All steel and rubble that is being removed from this project are being recycled by Perfect Contracting as we are now accredited GreenStar Waste Removal company which means we comply with all of GreenStar’s recycling guidelines.

Perfect Contracting have the extensive resources to carry out large-scale detailed demolition projects

Tags: , , , , , , , , ,
Continue reading
Detailed Demolition – Balmain, Sydney

Detailed Demolition – Balmain, Sydney

3 Level Detailed Demolition Project - Balmain

Our team members have recently started demolition works for our client Lloyd Group at 73 Beattie St in Balmain. These works involve the detailed three level structural demolition of a heritage building. As this building is historical this requires very technical and precise demolition works to be carried out. Firstly our team members started stripping out offices on the 3rd floor at the back of the building leaving the heritage trusses and roof. Next our team members are beginning works at the front of the building where our client requires the removal of the concrete floor slab and 2nd level to be brought down to ground level. For the removal of the concrete slab it was assessed that the safest and most efficient methodology would be to make a series of deep cuts in the slab both horizontally and vertically with a road saw and then to use our 5ton excavator to remove the slab in pieces. The front facade of the building is also heritage so this must remain intact. Our team members will be back propping the façade with tilt props to ensure it remains intact throughout the entirety of the demolition works. The works being carried out by our team members at the moment are part of stage one of works to be completed for our client. There is three stages in total as this is a very detailed heritage building demolition we take the upmost care in ensuring all heritage structures remain intact. All waste and rubbish material is being loaded out by our Isuzu Hook trucks for recycling. We are now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialise in detailed heritage demolition works, with years of expertise working with some of the oldest building in Australia.

Tags: , , , , , , ,
Continue reading
Haverick Meats, Banksmeadow, Sydney

Haverick Meats, Banksmeadow, Sydney

Perfect Contracting were engaged by Haverick Meats and to carry out Demolition works at Haverick Meats factory at Banksmeadow. The work involved a back to base stripping out of the entire factory after there was an extensive fire damage, this included hygenic removal of all remaining meat in the factory, removal of steel shelving within the factory.
Tags: , , , , , , , , , ,
Continue reading
The Vibe Hotel, Rushcutters Bay, Syndey, 2011

The Vibe Hotel, Rushcutters Bay, Syndey, 2011

Hotel demolition and stripout The Vibe Hotel, Rushcutters Bay - Sydney

Perfect Contracting were engaged by Lemko and TOGA Group to carry out Demolition works at The Vibe Hotel at Rushcutters Bay. The work involved a back to base stripping out 253 guest rooms, which included the removal of Carpet, Bed Heads, TV Cabinet Units and Small Tile Removal in Bathroom's. Perfect Contracting provided a team of eleven skilled demolition and rubbish removal labourers to carry out the works. All work was supervised by our Site Supervisor Moustapha Merhi to ensure safety of our team members and efficiency while carrying out the work.
Tags: , , , , , , , , , , , ,
Continue reading

Do you need tools & skilled labour?

Call Perfect Hire 1300 737 332.

Join over 10,000 subscribers and

signup to the Perfect Newsletter today.

CALL NOW