Tag: Floor

Strip Out, Surry Hills, 10-14 Waterloo St

Strip Out, Surry Hills, 10-14 Waterloo St

Perfect Contracting were hired by Mainbrace Constructions to perform demolition and strip-out works of three floors at 10-14 Waterloo St, Surry Hills. Level A1 is fully stripped-out and we have completed all works on Level A1 already. This project included the removal of over 670m2 of carpet tiles including underlying glue. Strip-out of the Male / Female toilets including tiles, wall tiles and splash-back including render which comes out with tiles, toilet partitions, doors and all toilet fixtures and fittings. Perfect were also contracted to remove 733m2 of existing ceiling tiles and grids.
Tags: , , , , , , , ,
Continue reading
Birrong Girls High School

Birrong Girls High School

Perfect Contracting were engaged to complete the full demolition and removal of a single storey building. The works involved required concrete cutting of certain sections of the building, followed by the operation of excavator to assist in demolition of the building. Asbestos was present at the site so careful planning and removal of the asbestos contaminated materials were required, along with safe disposal.
Tags: , , , , , , , , , , ,
Continue reading
13 Bayview Road, Bronte

13 Bayview Road, Bronte

Perfect Contracting were engaged to complete the strip out and demolition phase of a major renovation to residential premises in Bronte. Works included in demolition phase were demolition of floor tile and bedding, removal of interior timber floor and removal of exterior timber balconies and canopies.
Tags: , , , , , , ,
Continue reading
321 Kent Street, Sydney CBD

321 Kent Street, Sydney CBD

Main tasks: Demolition strip out project. Perfect Contracting has just completed a major demolition strip out project at 321 Kent Street, Sydney CBD. The project covered 10 levels of the building, which is managed by Dexus Property Group, and was previously occupied by a law firm. Each level was 1,500m2, a total of 7,500m2 for the total project. The project had an approximate value of $500,000 including floor preparation works.
Tags: , , , , , ,
Continue reading
TOYS R US Chatswood

TOYS R US Chatswood

Main tasks: floor preperation of 1500m2 strip out, detail demolition. Perfect Contracting were engaged to complete demolition works within the Toys “R” Us store in Westfield Chatswood. The initial phase of the project involved stripping out all internal fixtures within the 1,500m2 shop, requiring a waste management plan including truck and skip bin scheduling, and removal of all waste to EPA approved waste recovery centres.
Tags: , , ,
Continue reading