Tag: demolition

Demolition / Stripout – Novotel, Darling Harbour

Demolition / Stripout – Novotel, Darling Harbour

Demolition and Strip-out of Novotel at Darling Harbour

Perfect Contracting has just started works at Novotel at darling harbour for our clients Reward Hotel Projects. These works include the demolition and stripout of 200+ rooms, taking them back to base ready for a new fit out. This project is working in a live Hotel, which means the hotel is still fully operational. Our team members began works on the first level stripping out all rooms. The scope of works included, bathroom, ceiling, floor and wall strip-out of each room to a back to base. Our team members began works on the site by installing protective hoardings inside the services elevators that would be used for loading out all waste and rubble. Then they installed carpet protection film to ensure the carpet was not damaged when removing waste and rubble. All waste and rubble is loaded into our Tub Bin system this allows us to remove the waste and rubble very fast as it can be wheeled into the service elevator and loaded into our Skip Bins. This system also allows us to separate all waste types as here at Perfect we are committed to recycling 100% of waste and rubbish as one of major core values is to protect the environment. When our team members have finished the back to base strip-out of the first level then they will proceed with the strip-out of each of the upper levels. The Result: The client is very happy with the progress of the works carried out so far and are impressed with how efficient and professional each and everyone of our team members are.

Perfect Contracting have years of experience in providing demolition and strip-out services for the Hospitality Industry, call today to request a site visit! Call us on 1300 737 332!

Tags: , , , , , , , , , , ,
Continue reading
Demolition / Stripout of Ascham School in Edgecliffe

Demolition / Stripout of Ascham School in Edgecliffe

Demolition / Stripout of Ascham School in Edgecliffe in Sydney

Perfect Contracting are currently carrying out demolition and stripout of Ascham School in Edgecliffe for our client Infinity Group PTY Ltd. These works include the demolition of brick walls, strip-out of wall and floor tiles and removal of ceiling slabs and all services.
Tags: , , , , ,
Continue reading
Demolition / Stripout – Sydney International Airport

Demolition / Stripout – Sydney International Airport

Demolition and stripout works carried out at Sydney International Airport for EDT Projects PTY Ltd

Perfect Contracting recently completed a project at Sydney International Airport for EDT Projects PTY Ltd. The works involved the demolition and strip-out of a section of the Sydney International Airport.
Tags: , , ,
Continue reading
Brokk Demolition Robot – 165 Philips St

Brokk Demolition Robot – 165 Philips St

Perfect Contracting are currently using a Brokk Demolition Robot to demolish the stairwell at 165 Philips St. We needed the demolition power of a 15 ton excavator but due to the project being with load and size restrictions, it is impossible to get a excavator of that size into the building. This is where the Brokk 90 comes in; the Brokk 90 is one of the most versatile machines available for demolition in restricted areas. When the job has to be done in a confined space, size really does matter. The goal is to bring as much power and flexibility as possible to the site, and the Brokk 90 achieves it.
Tags: , , , , , , ,
Continue reading
Strip Out, Surry Hills, 10-14 Waterloo St

Strip Out, Surry Hills, 10-14 Waterloo St

Perfect Contracting were hired by Mainbrace Constructions to perform demolition and strip-out works of three floors at 10-14 Waterloo St, Surry Hills. Level A1 is fully stripped-out and we have completed all works on Level A1 already. This project included the removal of over 670m2 of carpet tiles including underlying glue. Strip-out of the Male / Female toilets including tiles, wall tiles and splash-back including render which comes out with tiles, toilet partitions, doors and all toilet fixtures and fittings. Perfect were also contracted to remove 733m2 of existing ceiling tiles and grids.
Tags: , , , , , , , ,
Continue reading
Birrong Girls High School

Birrong Girls High School

Perfect Contracting were engaged to complete the full demolition and removal of a single storey building. The works involved required concrete cutting of certain sections of the building, followed by the operation of excavator to assist in demolition of the building. Asbestos was present at the site so careful planning and removal of the asbestos contaminated materials were required, along with safe disposal.
Tags: , , , , , , , , , , ,
Continue reading
41 Cliff Road, Northwood

41 Cliff Road, Northwood

Perfect Contracting were engaged by Simon Zou to complete the strip out and demolition phase of a major renovation to residential premises in Northwood. Works included in demolition phase were demolition of floor/wall tile and bedding, concrete cutting and timber floor removal.
Tags: , , , ,
Continue reading
The Vibe Hotel, Rushcutters Bay, Syndey, 2011

The Vibe Hotel, Rushcutters Bay, Syndey, 2011

Hotel demolition and stripout The Vibe Hotel, Rushcutters Bay - Sydney

Perfect Contracting were engaged by Lemko and TOGA Group to carry out Demolition works at The Vibe Hotel at Rushcutters Bay. The work involved a back to base stripping out 253 guest rooms, which included the removal of Carpet, Bed Heads, TV Cabinet Units and Small Tile Removal in Bathroom's. Perfect Contracting provided a team of eleven skilled demolition and rubbish removal labourers to carry out the works. All work was supervised by our Site Supervisor Moustapha Merhi to ensure safety of our team members and efficiency while carrying out the work.
Tags: , , , , , , , , , , , ,
Continue reading