41 Cliff Road, Northwood

41 Cliff Road, Northwood

Perfect Contracting were engaged by Simon Zou to complete the strip out and demolition phase of a major renovation to residential premises in Northwood. Works included in demolition phase were demolition of floor/wall tile and bedding, concrete cutting and timber floor removal.

  • Detailed interior structural demolition
  • Internal strip out
  • Installation of structural support propping
  • Contract completed directly under direction and supervision of structural engineer

Following on from this a soft strip out of existing fixtures and fittings was required before grinding of waterproofing membrane and concrete grinding in preparation for new surface finishes. Works were completed in conjunction with setup and installation of back propping system under direct supervision of site structural engineer.

Tags: , , , ,
Back to Residential

Do you need tools & skilled labour?

Call Perfect Hire 1300 737 332.

Join over 10,000 subscribers and

signup to the Perfect Newsletter today.

CALL NOW