13 Bayview Road, Bronte

13 Bayview Road, Bronte

Perfect Contracting were engaged to complete the strip out and demolition phase of a major renovation to residential premises in Bronte. Works included in demolition phase were demolition of floor tile and bedding, removal of interior timber floor and removal of exterior timber balconies and canopies.

  • Internal strip out of multi level apartment block
  • Detailed interior demolition
  • Detailed external excavation
  • Specialised back to concrete grinding
  • Tight access load out using conveyor belts

Following on from this a soft strip out of existing fixtures and fittings was required before grinding of waterproofing membrane and concrete grinding in preparation for new surface finishes. Detailed exterior excavation was completed using a custom designed conveyer belt load out system, providing an effective and efficient solution for the client.

Tags: , , , , , , ,
Back to Residential

Do you need tools & skilled labour?

Call Perfect Hire 1300 737 332.

Join over 10,000 subscribers and

signup to the Perfect Newsletter today.

CALL NOW