Structural Demolition – Northwood

Structural Demolition – Northwood

Structural Demolition of Residential Property in Northwood

Perfect Contracting are currently performing structural demolition works for our client Horizon Habitats at Northwood, Sydney. The works included the removal of a section of the external wall of a residential house to allow for windows to be installed. Our team members first established all tools and equipment onto the site and setup the loading dock where they could load out the waste and rubble. Then our team members secured the site with temporary security fences to ensure the safety of the public during the duration of the works. Once the access and security was established our site supervisor liaised directly with the engineer from our client to establish the correct methodology for the removal of the section from the external supporting wall. Once the correct methodology was established our team members began by unloading and setting up our Acrow Props to prepare to prop the sub floor above to ensure the structure stayed intact and secure during the demolition process. When the engineer was confident there was sufficient support from the Acrow props to support the structure then our team members began by using our Husqvarna Concrete demo saw to cut the bottom of the wall. When the bottom was cut right through then they cut both sides. Our team members then began hammering the wall with our Hilti TE70’s being very careful to remove it section by section. Once we had nearly reached the top then we cut the remaining section at the top of the wall this ensured for a smooth clean finish. All the waste and rubble was loaded into our Isuzu Tipper Trucks for removal from site. Result: The client was very happy with the outcome of the works involved and how efficient and professional our team members were.

If you need very technical demolition works performed for your house renovation call the experts at Perfect Contracting to get it done!

Tags: , , , ,
Continue reading
Residential House Demolition / Stripout

Residential House Demolition / Stripout

Perfect Contracting recently finished multiple residential house demolition / strip-out's for Auscare Constructions Pty Ltd in Mosman. The scope of work included strip out of the houses including wall tiles and floor tiles in both kitchen and bathroom. Removal of kitchen units and kitchen tiles and carpet throughout the houses. Their were noise restrictions at this site as it was a residential area our team members had to wait till after 9am to use our Hilti Jack Hammers to strip the tiles from the bathroom and kitchen. While our team members waited they established all the equipment onto the site and organised a clear route to load out to the trucks. They began with general cleaning and dismantling the kitchen unit and sorting it into our Tub Bin system. This allows us to move this rubbish / waste around the site so that we cut down on double handling. After 9am our team members began to strip-out the bathroom and kitchen. Our Hook Trucks and Skip Bins removed all the waste from site. With all waste separated into our Tub Bin system our team members were easily able to wheel the Tub Bins out to the Hook Trucks and quickly load the Tub Bins straight into the Skip Bin. This allows for a quick extraction of waste materials from site minimising the time wasted during the load out process. The Result: Our team members finished the project on time, on budget and our client was very happy with the outcome.
Continue reading
Labour Hire at 118 Karimbla Rd, Miranda

Labour Hire at 118 Karimbla Rd, Miranda

Perfect Contracting are supplying Labour Hire to CJ Duncan for a residential works in Miranda for general site cleaning and some jack hammering as well. The site cleaning involved removing concrete slabbing and moving it outside the complex to be neatly stacked on palates so they can be easily loaded onto a truck at a later date. Also removing all scaffolding and wooden planks to be neatly stacked outside the complex to allow for removal at a later date. Our team member’s task is to clean the site and load all materials outside the complex so they can be easily removed from site via trucks. Our client CJ Duncan requested that our team members sort out all of the materials being cleaned up on site. There are some long wooden planks, aluminum meshing, scaffolding, ladders, bricks and waste building material. So our team members have removed all the slabbing and stacked it neatly on pallets outside the complex to allow these to be easily removed from site at a later date. We also are supplying one of our 10m2 Skip Bins to remove all building waste. This means all building materials like rubble, cement and dust can be easily loaded out from the site by our team members and removed by our hook truck when the skip is full. At Perfect we always ensure that our general labourers go through an extensive training to demonstrate correct use of equipment and proper use of personal protective equipment. These training days have allowed us to offer our clients team members who are reliable, responsible and can preform any task both safely and efficiently.
Tags: , , ,
Continue reading
41 Cliff Road, Northwood

41 Cliff Road, Northwood

Perfect Contracting were engaged by Simon Zou to complete the strip out and demolition phase of a major renovation to residential premises in Northwood. Works included in demolition phase were demolition of floor/wall tile and bedding, concrete cutting and timber floor removal.
Tags: , , , ,
Continue reading
13 Bayview Road, Bronte

13 Bayview Road, Bronte

Perfect Contracting were engaged to complete the strip out and demolition phase of a major renovation to residential premises in Bronte. Works included in demolition phase were demolition of floor tile and bedding, removal of interior timber floor and removal of exterior timber balconies and canopies.
Tags: , , , , , , ,
Continue reading