Structural Demolition – Marrickville Train Station

Structural Demolition – Marrickville Train Station

Structural demolition of bus platform with Husqvarna DXR 310 demolition robot

Perfect Contracting recently finished structural demolition works at Marrickville Train Station for our client ARENCO, these works included the detailed structural demolition of the bus shelter beside the station using the Husqvarna DXR 310 demolition robot.

Firstly our team members secured the site as all works were carried out in a live public site during the weekend so public safety was a high priority. Our team members began by establishing a perimeter around the site with our temporary site fences.

Once the site was secure and safe our team members moved our Brokk Demolition robot onto site. A traffic controller provided by our client to ensure traffic was safe during the project controlled the traffic.

Next our team members ran power to the site and established a small site perimeter around this detailed demolition to ensure everyone’s safety on site.

Then once our Husqvarna DXR 310 demolition robot was sure that the site was safe he proceeded to demo the bus shelter from underneath. The Husqvarna DXR 310 Demolition Robot was the safest methodology to carry out these works as it could reach up under the shelter that was protruding over the sidewalk below. This made it very safe to demo the support pillars without risking anyone’s safety.

Once the platform was fully demolished by the Husqvarna DXR 310 robot our team members extracted all the waste and rubble from the site with our Skip Bins and Tipper Trucks and cleaned up the area to ensure it was ready to be used by the public right away.

The Result: The client was very happy with the outcome of the works.

Back to Railway

Do you need tools & skilled labour?

Call Perfect Hire 1300 737 332.

Join over 10,000 subscribers and

signup to the Perfect Newsletter today.

CALL NOW