TOYS R US Chatswood

TOYS R US Chatswood

Main tasks: floor preperation of 1500m2 strip out, detail demolition.

Perfect Contracting were engaged to complete demolition works within the Toys “R” Us store in Westfield Chatswood. The initial phase of the project involved stripping out all internal fixtures within the 1,500m2 shop, requiring a waste management plan including truck and skip bin scheduling, and removal of all waste to EPA approved waste recovery centres.

Detailed demolition works were undertaken by our concrete care devision, involving concrete coring and cutting out penetrations in existing concrete fixtures.

The final stage of the works involved floor preparation of the complete 1,500m2 shop area, using a bobcat fitted with specially designed scraping attachment to remove all existing tiles. A large commercial concrete floor grinder was then used to grind the concrete removing any residue leftover after the tiles were removed to prepare the concrete floor for finishing.

Tags: , , ,
Back to Commercial

Do you need tools & skilled labour?

Call Perfect Hire 1300 737 332.

Join over 10,000 subscribers and

signup to the Perfect Newsletter today.

CALL NOW