3 Level Detailed Strip out – TAFE, Ultimo

3 Level Detailed Strip out – TAFE, Ultimo

3 Level Strip out – TAFE Ultimo, Sydney

Perfect Contracting have recently started demolition and stripout works for our client Rork Projects at TAFE Ultimo. These works involve carpet tile removal, gyprock walls, and glass removal. This building is classed as a historical building so it requires a technical demolition and stripout taking extra care to preserve all historical features such as door frames, stairs cases, windowsills, and chandeliers. As the lift in the building was small and is only classed as a personal lift it cannot be used as goods lift. It was assessed by our project manager that the most efficient way of removing all waste material from the building would be to use a scissor lift and skip bin at the side of the building and hand load all material manually into the skip. Our scissor lift operators have their EWP (Elevated Working Platform) tickets and are wearing safety harnesses and full PPE (Personal Protective Equipment) to ensure their safety. For the removal of the glass walls, our team members used our aluminium scaffold and suction pads to manually remove each piece of glass. The carpet tiles are being stripped on each floor and removed via the scissor lift. Special protection was installed on all staircases and balustrades by our client to ensure they remained intact throughout the duration of the project. For this project, we used our brand new 30m3 Skip Bin as this would allow us to load more material out each time. All waste and rubbish material is being loaded out by our new Isuzu Hook truck for recycling. We are also now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialises in detailed heritage demolition works, with years of expertise working with some of the oldest buildings in Australia.

Tags: , , , , , ,
Continue reading
Detailed Demolition – Balmain, Sydney

Detailed Demolition – Balmain, Sydney

3 Level Detailed Demolition Project - Balmain

Our team members have recently started demolition works for our client Lloyd Group at 73 Beattie St in Balmain. These works involve the detailed three level structural demolition of a heritage building. As this building is historical this requires very technical and precise demolition works to be carried out. Firstly our team members started stripping out offices on the 3rd floor at the back of the building leaving the heritage trusses and roof. Next our team members are beginning works at the front of the building where our client requires the removal of the concrete floor slab and 2nd level to be brought down to ground level. For the removal of the concrete slab it was assessed that the safest and most efficient methodology would be to make a series of deep cuts in the slab both horizontally and vertically with a road saw and then to use our 5ton excavator to remove the slab in pieces. The front facade of the building is also heritage so this must remain intact. Our team members will be back propping the façade with tilt props to ensure it remains intact throughout the entirety of the demolition works. The works being carried out by our team members at the moment are part of stage one of works to be completed for our client. There is three stages in total as this is a very detailed heritage building demolition we take the upmost care in ensuring all heritage structures remain intact. All waste and rubbish material is being loaded out by our Isuzu Hook trucks for recycling. We are now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialise in detailed heritage demolition works, with years of expertise working with some of the oldest building in Australia.

Tags: , , , , , , ,
Continue reading
Asbestos Removal – Knox Grammar School, Wahroonga

Asbestos Removal – Knox Grammar School, Wahroonga

Perfect Contracting finished asbestos removal works at Knox Grammar School in Wahroonga for our client Maintlink. The works included asbestos removal works, removal of wall and floor tiles and removal of hazardous lead paint from the roof.
Tags: , , , , , , , ,
Continue reading
Half House Demolition – Leichhardt

Half House Demolition – Leichhardt

  Our team members have recently finished half house demolition works for our client Pioneer Projects in Leichhardt, Sydney. The scope of works involved removal of roof sheets, timber frame and insulation. Removal of gyprock walls, removal of bathroom tiles and removal of some external brick walls. Firstly our site supervisor met with our client’s representative on site to discuss the full scope of works and get a better understanding on their requirements. Once they were informed of the work to be carried out our team members began by establishing all tools and equipment on site. After the toolbox talk from our supervisor of the potential hazards on site our team members began with the bathroom tile removal. The bathroom tiles were removed using out Hilti TE800 Jackhammers and Tile Smasher attachments. Once all wall and floor tiles were stripped our team members began loading out the waste and rubble with hand bins into our Isuzu Tipper Truck. Access for this project was limited as there was only a narrow pathway at the side of the house. Next our team members began breaking the concrete slab in the laundry, as per the client request. This was done using our bigger Hilti TE1500 and TE3000 Jackhammers that are designed for breaking up heavy concrete slabs. The final stage of this project was the removal of four external walls at the rear of the house. Firstly our more experienced team members made precise vertical cuts along the wall on both sides of the brick with our Husqvarna K9600 Demolition Saw. This ensures that when the wall was being removed that the adjoining walls are not affected. Once all work was complete on this project all our team members loaded out all waste and rubble into out Isuzu Tipper Truck for recycling.

Perfect Contracting have the knowledge and experience to carry out precise residential demolition works

Tags: , , , , , , ,
Continue reading
Stripout – T2 Domestic Sydney Airport

Stripout – T2 Domestic Sydney Airport

Demolition / Stripout – T2 Domestic Sydney Airport

Perfect Contracting recently finished demolition and stripout works for our client HICON Building at Terminal 2 Sydney Domestic Airport as part of the Sydney Airport’s Retail Expansion of the T2 Terminal. These works involved the demolition and strip out of a number of bathrooms including tile removal, removal of fittings, ceiling tile removal and stud wall removal. For stage one of the works our team members carried out the demolition and strip out of the first bathroom. Our team members firstly setup our zip walls to isolate the area and control the dust created. They then began the removal of the bathroom wall and floor tiles using our Hilti TE 1000 Jackhammers with the Tile Smasher attachment. Once all wall and floor tiles were removed they then removed all bathroom fittings and fixtures. All waste and rubble was loaded into our Tub Bins this allows for a fast removal from the site as our Tub Bins are custom fitted with Fork Lift grips and can easily be loaded into our Skip Bins for a swift removal from site. All throughout the works our team members used our Hilti VC-40 Dry/Wet Vac’s to vacuum up all excess dust ensuring we kept control of the dust. All waste and rubble was removed by our Isuzu Hook and Tipper trucks for recycling as we are committed to reaching our goal of recycling over fifty percent of waste and rubble we remove from sites.

Perfect Contracting have the resources and capacity to carry out large commercial strip out works.

Tags: , , , , , ,
Continue reading
Concrete Penetrations – Chester Hill

Concrete Penetrations – Chester Hill

Perfect Contracting have recently finished concrete penetrations for our client AJW Interiors at Chester Hill. This work involved the concrete penetrations of concrete floor along with matching penetrations on the 1st floor slab to allow for a new lift and lift pit installation. The client requested dust control for this project so firstly our team members setup our Zip Walls around the site to ensure dust was contained. We also used our Hilti VC-40 Dry / Wet Vac’s to extract and clean up dust and rubble as we carried out the work. The floor slab was over 150mm thick so required our team members to use out Husqvarna K6500 High Frequency Ring Saw as this would be only hand demolition saw that could cut down to the depth required. As there was no water supply at the site our team members used our portable Makinex Hose2U waster pumps, these connect directly to the Ring Saw. This water supply keeps the diamonds cool on the blade allowing for a cleaner and more efficient cut. Once all cuts had been made to the slab our team members then used out Hilti TE 1000 Jackhammers to break up all the excess concrete and penetrate through the slab, this would allow our client to install the lift pit shaft. When all the concrete was broken up our team members then loaded out all waste and rubble to our Isuzu Tipper truck to be removed for recycling. They then made one last tidy up using our Hilti VC-40 Dry Vac’s to ensure the area was left as clean as possible before finishing up.

Perfect Contracting can carry out clean and precise Concrete Penetrations in any kind of environment. We can setup Zip Walls and apply dust control measures to ensure the surrounding area’s are not effected

Tags: , , ,
Continue reading
Stripout – TK Maxx, Castle Hill

Stripout – TK Maxx, Castle Hill

Stripout – TK Maxx, Castle Hill

Our team members have recently finished demolition and strip out works for our client Unita at TK Maxx in Castle Hill. These works involved the strip out of 150m2 space within the TK Maxx store. The scope of these works involved vinyl tile removal, strip out of shelving units and removal of all rubbish and waste. For the vinyl tile removal our team members used our Hilti TE 1000 and Hilti TE 1500 Jackhammers with the Tile Smasher attachment. This allows us to strip the vinyl tiles and also remove the epoxy glue between the tiles and the concrete slab. These works also included the removal of the shop front while retaining glass panels adjacent to the shop front. Our team members carefully removed the shop fittings and removed them from site. Our team members carried out all works after hours and used our Zip Walls to control dust created while the tiles were being stripped. This would ensure the dust created would not affect the rest of the store, as the store would be open to the public during the day. All waste and rubbish was firstly separated and sorted in our Tub Bins. It was all then loaded into our Hook Trucks and removed from site for recycling.

Perfect Contracting have the experience and expertise to can carry out demolition and strip out works in live public commercial area’s

Continue reading
Structural Demolition – Manly Wharf

Structural Demolition – Manly Wharf

Structural Demolition – Manly Wharf

Perfect Contracting have just finished major structural demolition works for our client Rewards Hotel Projects at Manly Wharf. These works involved the roof removal, penetrations, and shop strip outs. The first stage of these works involved the detailed structural demolition of a corrugated steel roof and removing the trusses supporting it. All corrugated steel sheets were manually dismantled and neatly stacked. Once all materials were dismantled and neatly stacked and strapped we used a 20 Tonne Mobile crane to lift a Crawler Crane onto the roof. This crawler crane was then used to Crane down all the materials into our Hook Trucks for removal. Another stage of the works was to perform concrete penetrations to allow for the installation of a new stairwell and new lifts. These works involved a lot of Oxy cutting to remove steel beams throughout the structure. A separate stage of these works involved the strip out of a fish shop unit on the ground level. This involved a back to base strip out of the shop unit including wall and floor tiles removal and removal of all units and services. Result: Our client Rewards Hotel Projects was very pleased with the quality of works carried out throughout the project.

Perfect Contracting can carry out complex and detailed structural demolitions!

Continue reading
House Demolition – Woolahra

House Demolition – Woolahra

House Demolition - Woolahra

Perfect Contracting just recently finished a house demolition and strip out works for our clients Out N’ Up. These works involved the demolition and strip out of a residential house in Woolahra. The full scope of works for this project included carpet removal, floor tile removal, ceiling tile removal and bathroom strip outs. For the first day of works our team members established all tools onto site along with our Toolbox, performed a soft strip out including the carpet on the stairs and floor tiles on the lower levels. The second day our team members began the bathroom strip outs which involved the removal of wall and floor tiles, all gyprock off the studded walls and removal of all the bathroom fittings. Once our team members had finished the bathroom strip outs then they started working on the demolition of some of the internal walls. Due to some of these walls being load bearing, we firstly installed our Acrow props to ensure the integrity of the building remains intact. All waste and rubbish that was removed from this site was recycled helping us to reach our goal of recycling over 50% of waste and rubble we remove from sites before the end of year. As we are now a GreenStar accredited demolition contractor we have a very strong focus on recycling and the impact we have on the environment. Once all demolition works were completed we performed an extensive site clean up to ensure we left the site as clean as possible. Result: Our client Out N’ Up was delighted the quality of the works carried out by our team members and the professional condition the site was left in.

Perfect Contracting have the resources and capabilities to carry out any size of project you may require!

Continue reading
Demolition – North Sydney Train Station

Demolition – North Sydney Train Station

Demolition – North Sydney Train Station

Perfect Contracting were engaged by our client Obson Projects to complete demolition works at North Sydney Train Station. These works involved the tile removal and demolition of part of the North Sydney Train Station. The full scope of works for this project was to strip the tiles from a section of the concourse. On some parts of this project we were able to use our small 1tonne Yanmar Excavator with hammer attachment, this made the tile stripping a lot faster and meant we could focus on loading out the rubble as quick as possible. For other part of this project the access was limited so we could not get our excavator into the area so all tiles were removed with our Hilti TE800 Jackhammers and wide chisels. One stage of the works carried out was to strip the tiles from the stairs and landing within the concourse. As the area was still a live public area most of these works were completed after hours. Site barriers were setup to protect the public while carrying out the demolition works. All waste and rubble was loaded out in our Isuzu Tipper trucks and 100% of waste and material removed from the site was recycled. Result: Our client Obson Projects were very pleased with the quality of the works carried out.

Perfect Contracting can carry out complex and detailed structural demolitions!

Continue reading

Do you need tools & skilled labour?

Call Perfect Hire 1300 737 332.

Join over 10,000 subscribers and

signup to the Perfect Newsletter today.

CALL NOW