Make Good – Westpac, Sydney

Make Good – Westpac, Sydney

Make Good – Westpac, 275 Kent St, Sydney

Perfect Contracting team members recently finished Make Good works for our client MPA Constructions at the Westpac building on 275 Kent St, Sydney. The scope of works involved over 2000m2 of carpet tile and gyprock wall removal Our team members firstly were all inducted on site to ensure their safety throughout the entire project. Once induction was complete they began to establish our toolboxes and material handing equipment onto the site. Due to this being a large project we had two crews working on this. One crew would perform all the gyprock wall and carpet tiles removals throughout the day and stockpile it all on our trolleys and tub bins systems so they could be loaded out at night by our second crew. Our team members then began by removing the gyprock wall using our Hilti Cordless Reciprocating Saws, being very careful not to disrupt any services. Once all the gyprock walls were taken down they were loaded into our trolleys and tub bins so that they could be loaded out that night. All waste material was separated into our Tub Bins and Trolleys so that we could easily recycle the different materials, as we are now GreenStar accredited waste removal specialists. All load outs were carried out at night as due to the decreased traffic on the roads we have a quicker turn around with our Hook Trucks and Skip Bins.

Perfect Contracting have years of experience performing Make Goods for our clients all across the Sydney. For

Tags: , , , , ,
Continue reading
Clancy Catholic College – Detailed Demolition

Clancy Catholic College – Detailed Demolition

Detailed Demolition – Clancy Catholic College, West Hoxton

Perfect Contracting recently began works for our client Lloyd Group at Clancy Catholic College in West Hoxton. These works included bathroom strip outs, demolition of an awning, demolition of a concrete slab and loading all waste and rubbish out. Our team members began with the changing rooms, stripping out all bathroom stalls and fixtures. Then our team members stripped all wall and floor tiles in the bathroom using our Hilti TE1000 Jackhammers. Next, our team members began the removal of roofing sheets, insulation and external cladding. All team members while removing the roofing sheets wore safety harnesses. Once all roofing sheets and external cladding was removed our excavator operator then pulled down the rest of the structure with our Yanmar 1.7t Excavator. Part of the scope of works included the removal of a concrete slab, our team members used our Husqvarna Ring Saw to cut eh slab into sections. Once the slab was cut through our experienced operator started using our Yanmar 1.7t with hammer attachment to break up the slab. Next, our team members removed the large windows on the north, south, and west of the building. Our team members have years of experience working in education facilities and have the expertise to carry out complex demolition works without disrupting the operational functionality of the building. All waste material was removed from the site by our Isuzu Hook truck with a 15m3 Skip Bins. As we are now GreenStar approved waste removal specialists all waste is sorted by our yard and recycled.

Perfect Contracting have worked with many educational facilities over the years to offer our detailed demolition services!

Tags: , , , , , , , ,
Continue reading
Macquarie University – Detailed Demolition

Macquarie University – Detailed Demolition

Macquarie University - Detailed Demolition

Perfect Contracting recently began works for our client Taylor Constructions at Macquarie University in Sydney. These works included removal of a brick wall and a ceiling strip out. Our team members began by carefully removing the brick wall using our Hilti TE1000 Jackhammers with the chisel attachment. Removing all the rubble using our Tub Bin system allows us to swiftly load out all the waste into our Hook Trucks in the loading area. Next our team members began by carefully dismantling the ceiling tiles being carefully to leave all services intact. All waste and rubble was loaded out into our Isuzu Tipper trucks and removed for recycling. Perfect Contracting have years of experience working in education facilities and have the expertise to carry out complex demolition works without disrupting the operational functionality of the building. All waste material was removed from the site by our Isuzu Hook truck with a 15m3 Skip Bins. As we are now GreenStar approved waste removal specialists all waste is sorted at our yard and recycled.

Perfect Contracting have worked with many educational facilities over the years to offer our detailed demolition services!

Tags: , , , , ,
Continue reading
Travelator Removal – Sydney Domestic Airport T2

Travelator Removal – Sydney Domestic Airport T2

Travelator Removal – Sydney Domestic Airport T2

PERFECT CONTRACTING™ have recently started travelator removal works for our client HICON Building at Sydney’s Domestic Airport T2. These works involve the detailed demolition and strip out of several travelators in the airport terminal. Our team members began dismantling the first travelator on the 25th of October. The client requested all works to be carried out after hours due to restrictions in the airport. Protective hoarding was established by our client as protection for the public as the terminal is a live public space during the day. Firstly our team members began by oxy cutting the structural parts of the travelator to allow access to remove the individual sections. Next, our team members began removing the machine brakes, balustrade lighting, handrail, drive chain and track system. The glass balustrades were removed carefully by our team members along with the handrail and belt. This allowed our team members greater access to remove the tread ways. All waste material was removed from the site by our Isuzu Hook truck with a 15m3 Skip Bins. As we are now GreenStar approved waste removal specialists all waste was sorted at our yard and recycled.

Perfect Contracting have years of experience in dismantling and removing Travelators / Escalators and Lifts. Give our Estimations department a call today to request a quote!

Tags: , , , , , , ,
Continue reading
8 Level Demolition Project – Pyrmont

8 Level Demolition Project – Pyrmont

8 Level Demolition Project - Pyrmont

Perfect Contracting have commenced stage one of demolition works for our client Infinity Group, in Pyrmont. This demolition project is to be carried out over 8 levels and involve over two hundred concrete penetrations through the floor slabs; three lift removals, heritage window removals, asbestos removal and structural steel demolition. Firstly, our experienced riggers performed a lift removal at the north side of the building. This involved the removal of the lift car and lining, shaft core walls and existing lift motor. Our rigger then installed certified hoisting equipment so we can use the lift allow us to transport our 0.8ton Yanmar Mini-Excavator with the hammer attachment to speed up the wall and floor penetrations on the upper levels. While the lift shaft on the north side of the building is being rigged out as a material hoist, our other team members are demolishing the concrete slab on ground level. This involves the removal of 750m2 of the existing concrete slab, which is 150mmthick. To perform these works, our experienced operators are using our Yanmar 1.7ton Mini-Excavator with hammer attachment and our large Bobcat S590 Loader to hammer out the slab and load out the waste and rubble directly to our 15m3 skip bins. All waste and rubble are to be extracted from the site via our Isuzu hook trucks for recycling. As soon as the lift at the north side of the building was fitted with our winch, our team members lifted our 0.8ton Yanmar Mini-Excavator to Level 8 to begin demolition works. Our team members also hoisted our two Bobcat S70’s to load out all the waste and rubble. As this site is a heritage structure, our team members are taking a duty of care when carrying out all the demolition works to ensure all heritage structures remain intact throughout the demolition works. All steel and rubble that is being removed from this project are being recycled by Perfect Contracting as we are now accredited GreenStar Waste Removal company which means we comply with all of GreenStar’s recycling guidelines.

Perfect Contracting have the extensive resources to carry out large-scale detailed demolition projects

Tags: , , , , , , , , ,
Continue reading
3 Level Detailed Strip out – TAFE, Ultimo

3 Level Detailed Strip out – TAFE, Ultimo

3 Level Strip out – TAFE Ultimo, Sydney

Perfect Contracting have recently started demolition and stripout works for our client Rork Projects at TAFE Ultimo. These works involve carpet tile removal, gyprock walls, and glass removal. This building is classed as a historical building so it requires a technical demolition and stripout taking extra care to preserve all historical features such as door frames, stairs cases, windowsills, and chandeliers. As the lift in the building was small and is only classed as a personal lift it cannot be used as goods lift. It was assessed by our project manager that the most efficient way of removing all waste material from the building would be to use a scissor lift and skip bin at the side of the building and hand load all material manually into the skip. Our scissor lift operators have their EWP (Elevated Working Platform) tickets and are wearing safety harnesses and full PPE (Personal Protective Equipment) to ensure their safety. For the removal of the glass walls, our team members used our aluminium scaffold and suction pads to manually remove each piece of glass. The carpet tiles are being stripped on each floor and removed via the scissor lift. Special protection was installed on all staircases and balustrades by our client to ensure they remained intact throughout the duration of the project. For this project, we used our brand new 30m3 Skip Bin as this would allow us to load more material out each time. All waste and rubbish material is being loaded out by our new Isuzu Hook truck for recycling. We are also now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialises in detailed heritage demolition works, with years of expertise working with some of the oldest buildings in Australia.

Tags: , , , , , ,
Continue reading
Detailed Demolition – Balmain, Sydney

Detailed Demolition – Balmain, Sydney

3 Level Detailed Demolition Project - Balmain

Our team members have recently started demolition works for our client Lloyd Group at 73 Beattie St in Balmain. These works involve the detailed three level structural demolition of a heritage building. As this building is historical this requires very technical and precise demolition works to be carried out. Firstly our team members started stripping out offices on the 3rd floor at the back of the building leaving the heritage trusses and roof. Next our team members are beginning works at the front of the building where our client requires the removal of the concrete floor slab and 2nd level to be brought down to ground level. For the removal of the concrete slab it was assessed that the safest and most efficient methodology would be to make a series of deep cuts in the slab both horizontally and vertically with a road saw and then to use our 5ton excavator to remove the slab in pieces. The front facade of the building is also heritage so this must remain intact. Our team members will be back propping the façade with tilt props to ensure it remains intact throughout the entirety of the demolition works. The works being carried out by our team members at the moment are part of stage one of works to be completed for our client. There is three stages in total as this is a very detailed heritage building demolition we take the upmost care in ensuring all heritage structures remain intact. All waste and rubbish material is being loaded out by our Isuzu Hook trucks for recycling. We are now GreenStar Accredited Waste Removal Specialists we are committed complying with all GreenStar guidelines.

Perfect Contracting specialise in detailed heritage demolition works, with years of expertise working with some of the oldest building in Australia.

Tags: , , , , , , ,
Continue reading
Asbestos Removal – Knox Grammar School, Wahroonga

Asbestos Removal – Knox Grammar School, Wahroonga

Perfect Contracting finished asbestos removal works at Knox Grammar School in Wahroonga for our client Maintlink. The works included asbestos removal works, removal of wall and floor tiles and removal of hazardous lead paint from the roof.
Tags: , , , , , , , ,
Continue reading
Half House Demolition – Leichhardt

Half House Demolition – Leichhardt

  Our team members have recently finished half house demolition works for our client Pioneer Projects in Leichhardt, Sydney. The scope of works involved removal of roof sheets, timber frame and insulation. Removal of gyprock walls, removal of bathroom tiles and removal of some external brick walls. Firstly our site supervisor met with our client’s representative on site to discuss the full scope of works and get a better understanding on their requirements. Once they were informed of the work to be carried out our team members began by establishing all tools and equipment on site. After the toolbox talk from our supervisor of the potential hazards on site our team members began with the bathroom tile removal. The bathroom tiles were removed using out Hilti TE800 Jackhammers and Tile Smasher attachments. Once all wall and floor tiles were stripped our team members began loading out the waste and rubble with hand bins into our Isuzu Tipper Truck. Access for this project was limited as there was only a narrow pathway at the side of the house. Next our team members began breaking the concrete slab in the laundry, as per the client request. This was done using our bigger Hilti TE1500 and TE3000 Jackhammers that are designed for breaking up heavy concrete slabs. The final stage of this project was the removal of four external walls at the rear of the house. Firstly our more experienced team members made precise vertical cuts along the wall on both sides of the brick with our Husqvarna K9600 Demolition Saw. This ensures that when the wall was being removed that the adjoining walls are not affected. Once all work was complete on this project all our team members loaded out all waste and rubble into out Isuzu Tipper Truck for recycling.

Perfect Contracting have the knowledge and experience to carry out precise residential demolition works

Tags: , , , , , , ,
Continue reading
Stripout – T2 Domestic Sydney Airport

Stripout – T2 Domestic Sydney Airport

Demolition / Stripout – T2 Domestic Sydney Airport

Perfect Contracting recently finished demolition and stripout works for our client HICON Building at Terminal 2 Sydney Domestic Airport as part of the Sydney Airport’s Retail Expansion of the T2 Terminal. These works involved the demolition and strip out of a number of bathrooms including tile removal, removal of fittings, ceiling tile removal and stud wall removal. For stage one of the works our team members carried out the demolition and strip out of the first bathroom. Our team members firstly setup our zip walls to isolate the area and control the dust created. They then began the removal of the bathroom wall and floor tiles using our Hilti TE 1000 Jackhammers with the Tile Smasher attachment. Once all wall and floor tiles were removed they then removed all bathroom fittings and fixtures. All waste and rubble was loaded into our Tub Bins this allows for a fast removal from the site as our Tub Bins are custom fitted with Fork Lift grips and can easily be loaded into our Skip Bins for a swift removal from site. All throughout the works our team members used our Hilti VC-40 Dry/Wet Vac’s to vacuum up all excess dust ensuring we kept control of the dust. All waste and rubble was removed by our Isuzu Hook and Tipper trucks for recycling as we are committed to reaching our goal of recycling over fifty percent of waste and rubble we remove from sites.

Perfect Contracting have the resources and capacity to carry out large commercial strip out works.

Tags: , , , , , ,
Continue reading