2016 has been a fantastic year for Perfect Contracting, we expanded rapidly. Completed some big projects and a massive effort was put in from everyone here at perfect to serve all our clients to the best of our ability. With all this hard work over the year we decided to do something fun for our Christmas Party. We all attended Wanda Beach in Cronulla on a beautiful Saturday morning for Beach Olympics. We took part in Volleyball, Beach Soccer and even had a Hula Hoop competition and a fantastic day was had by all involved.

hula_4
hula_3
Continue reading
321 Kent Street, Sydney CBD

321 Kent Street, Sydney CBD

Perfect Contracting has just completed a major demolition strip out project at 321 Kent Street, Sydney CBD, where a interior refurbishment client engaged us. The project covered 5 levels of the building, which is managed by Dexus Property Group, and was previously occupied by a law firm. Each level was 1,500m2, a total of 7,500m2 for the total project. The project had an approximate value of $500,000 including floor preparation works.
Continue reading
Town Hall Train Station Refurbishment

Town Hall Train Station Refurbishment

As part of the refurbishment of Town Hall Train Station, Perfect Contracting were engaged by Degnan to assist in the removal of the structural floor situated above four story high escalators. Financed by Sydney Trains the main purpose of the project was to improve the exterior look of the escalators. With the work being carried out in the train station all workers needed RISI Rail Safety certs which all of our team members already had.
Continue reading
Oxford Train Station – Propping Bridge

Oxford Train Station – Propping Bridge

1. Hanging the universal beam – 410 UB 53.7 kg/m, 3.5m long with total weight of 188kg
Perfect Contracting crew secured the working zone with bollards and danger tape. The beam was lifted up by Material Lift (Genie Lift 5.5m 295kg capacity) and secured by straps on both sides of the footbridge. As a second protection certified slings were installed. Afterwards there were 3 sets of plates installed underneath main girders. Each set consisted of 2 spacer plates: 500x200x3t. Next straps and slings were tied up, having made sure the beam hanged securely, the genie lift was removed off the site to allow for footing assembly.
Continue reading